Customer Service:770-518-0045
Fax: 770-518-8507
Website: www.suspenz.com
Suspenz®, Inc.
8725 Roswell Road #0-220
Atlanta GA 30350
Rev. 10/18
Model # 31
-
0636
Model # 32
-
0603
For Technical assistance or Replacement parts: call 866.787.7369
3-Boat Frame
Tools Needed: ¹/₂”
Wrench and #5 Allen Wrench (included)
A cold beverage of your choice
Assembly
Step 1: Leveling Feet Attachment
Parts Needed: 2 U
-
Bases
,
Hardware Bag F
The
Anchor
is used when anchoring
Base
to floor, ground or dock.
These may be omitted when
Base
is on a stable level surface/
environment.
•
With
Anchors
, remove first
Hex Nut
from
Leveling Foot,
place
Anchor
on foot and then
screw
Hex Nut
back on. Screw into
Base.
•
Without
Anchors
, screw four
Leveling Feet
into welded nut in each
Base
.
Repeat for second tower.
Step 2: Base Post Attachment
Parts Needed: 2
Base Posts
,
Hardware Bag A
Scan* to see
Video Instructions
for Assembly & Use
or
Visit Suspenz.com
“Video & Manual” page
*
QR code reader app required
*Hardware for Marine Grade 3
-
Boat
Frame (32
-
0603) will be stainless steel.
•
Place
Base Post
over
Base
with square holes (Front) facing inside of
Base
(Front). Note: The “Front” labels are removable.
•
Insert two
Carriage Bolts through
vertical holes on
top and close with
Washer
and
Lock Nuts
from underside of
Base .
Tighten loosely by hand.
•
Insert two
Carriage Bolts
through horizontal holes on inside of
Base
and close
with
Washer
and
Lock Nuts
from outside of
Base .
Tighten loosely by hand.
•
Once all hardware is attached fully tighten vertical bolts before fully tighten-
ing horizontal bolts.
PARTS LIST*
QTY
Parts
2
U
-
Base
2
24" Base Post
4
28" Post
Bag A
-
Base Post to Base
8
5/16" x 2 3/4" Carriage Bolt
8
5/16" Washer
8
5/16" Lock Nut
Bag C
-
Post to Post
8
5/16" x 1" Hex Bolt
8
5/16" Thick Washer
8
5/16" Lock Washer
Bag E
-
Arm Mount
12
5/16" x 3 1/2" Allen Head Bolt
24
5/16" Washer
12
5/16" Lock Nut
Bag F
-
Leveling Feet
8
Leveling Feet
16
Hex Nut
8
Anchors
Wrenches
1
1/2" Wrench
1
#5 Allen Wrench