background image

Before you begin:

SITE PREPARATION

1

Rack and appliance precautions

-

ALL RACKS MUST BE MOUNTED SECURELY.

  Ensure that all leveling 

jacks or stabilizers are properly attached to the rack.  If installing 
multiple appliances in a rack, make sure the overall loading for each 
branch circuit does not exceed the rated capacity. 

-

Do not slide more than one appliance out from the rack at a time. 
Extending more than one appliance at a time may result in the rack 
becoming unstable.  Install your appliance in the lower part of the 
rack because of its weight and also for ease of use for accessing 
appliance components.

-

Allow the hot plug SCSI drives and power supply units to cool before 
touching them.

-

Always keep the rack's front door and all panels and components on 
the appliances closed when not servicing to maintain proper cooling.

Unpacking the appliance  

-

Verify that the ship kit includes a power cord, the screws you will 
need to install the appliance in your rack,  and 2 rack rail assemblies. 
The rack rail assemblies consist of 2 sections: 
1. A set of inner fixed chassis rails that attach to the appliance 

(these must be removed from the set of outer fixed rack rails).

2. A set of fixed rack brackets that attach directly to the rack itself. 
3. A set of outer fixed rack rails that attach to the outer fixed 

brackets. The outer fixed rack rails each contain a sliding guide 
that remains attached to each of these rails.

Setup location

-

Choose a setup location with proper temperature control and 
adequate floor loading capacity for the current installation and for 
future growth.

-

Install in or near appropriate AC outlets, and Ethernet hubs or 
individual jacks (10/100 Base-T cables cannot be longer than 
100 meters).

-

Leave enough clearance, 25 inches in the front, and 30 inches in the 
back of the rack to enable you to access appliance components and 
allow for sufficient airflow.

Installation or operation of
appliances stacked on a desktop 
table is not supported.

Required operating conditions
for the appliance are -
Temperature: 0 to 35

o

C. 

Humidity, non-condensing: 
5 to 80%.

NOTE: See other Cautions below.

CAUTION

This appliance is intended 
for installation in restricted 
areas only. Initial setup 
and maintenance should 
be performed by qualified 
personnel.

CAUTION

CAUTION

CAUTION

CAUTION

CAUTION

CAUTION

CAUTION

CAUTION

There is a danger of explosion if the battery is replaced
incorrectly.  Replace only with the same or equivalent 
type recommended by the manufacturer.  Dispose of 
used batteries according to the battery manufacturer's
instructions.  Contact technical support if you need to
replace a battery to ensure proper replacement.

Failure to properly ground the appliance, either by 
circumventing the 3-wire grounding-type plug or by 
using a power outlet that is improperly grounded, can 
create a potentially hazardous electrical situation.

To prevent the unit from overheating, never install 
the appliance in an enclosed rack or room that is not 
properly ventilated or cooled.  For proper airflow, 
keep the front and back sides of the appliance clear 
of obstructions and away from the exhaust of other 
equipment. 

Electrostatic Discharge (ESD) precautions are required 
before handling the appliance. Wear a wrist strap with
an appropriate ground connection.

Power down the appliance following the operating
system's proper power down procedure from the front
panel.  It is also recommended that the power cord be
unplugged before servicing.

Do not use mats designed to decrease static electrical 
discharge as protection from electrical shock. Use only 
mats that have been specifically designed to electrical 
insulators.

FCC Notice

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may 
not cause harmful interference, and (2) this device must accept any interference received, including interference that may 
cause undesired operation.
No Telecommunications Network Voltage (TNV)-connected PCBs shall be installed.

Ï

2005  All rights reserved.

Отзывы: