![Sur-Gard SG-System 5 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/sur-gard/sg-system-5/sg-system-5_installation-manual_1406540006.webp)
3.0 Approvals
- 6 -
1.
Secondary line card phone connections
2.
Secondary SG-CPM5 Ethernet connection
3.
Secondary SG-CPM5 automation and printer port
4.
Secondary SG-PSU5 AC power connection (see note)
5.
Secondary SG-CPM5 display connection
6.
Primary line card Ethernet connections
7.
Primary SG-CPM5 Ethernet connection
8.
Primary SG-CPM5 automation and printer port
9.
Primary SG-PSU5 AC power connection (see note)
10.
Primary SG-CPM5 display connection
NOTE: Employ only 26 AWG wires for the Telco connections.
NOTE: The power cord must be routed ¼ inch away from all other cables coming from or which are part of the SG-System 5.
SG-System 5 PSTN loading capacity of hunt groups
Number of lines in hunt group
System loading at the supervising station
1
2
3
4
5-8
Number of initiating circuits
NA
5000
10000
20000
20000
Number of DACTs
NA
500
1500
3000
3000
With DACR lines processed serially
Number of initiating circuits
NA
3000
5000
6000
6000
Number of DACTs
NA
300
800
1000
1000
Содержание SG-System 5
Страница 11: ......