background image

With the brackets firmly fixed and level, the radiator is 
lowered directly onto the brackets. When commissioning 
your radiator on an indirect/closed system we recommend 
using a suitable quality and quantity of  mixed metal 
inhibitor to protect against scale & corrosion. 

Damage 

caused to systems not protected by a suitable inhibitor 
will not be covered by manufacturer’s guarantee.

You should have:

•  1 Radiator
•  4 Wall Brackets
•  1 Manual Airvent
•  1 Blanking Plug
•  Spring Diverter

You will need:

•  Tape measure
•  Electric drill and bits
•  Spirit level

2. Contents

5. Hang & Commission

 Radiator

Technical Specifications

Materials

 

  

Aluminium.

Connections

     

   

½” flow and return.

Test pressure

 

   

9 Bar

Testing authority

 

  

EN442

Maximum operating pressure

 

6 Bar

Maximum working temperature 

110ºC 

Packaging

 

   

Wrapped in polythene & boxed.

You will have been supplied with at least four brackets (see 
drawing 1 overleaf). The brackets are typically positioned 
one section in from either end with extra brackets spaced at 
equal distances between these two (see drawing 2 overleaf).

Mark and fix the 2 top brackets checking they are level. Hang 
radiator in position and mark the location of the 2 bottom 
brackets and fix in place. Brackets should be fixed using 
suitable drill bit, screws and plugs.

PLEASE NOTE:

It is essential that all brackets are level and square prior to 
hanging the radiator to ensure a vertical alignment for 
connecting the pipework.

4.Fix Brackets

All products must be inspected once removed 
from the packaging and your point of 
purchase notified within 28 days of delivery 
of any scratches, blemishes or other damage. 
Your point of purchase will then agree 
appropriate action.
Imperfect radiators should therefore not be 
fitted and we will not accept responsibility 
for replacement of scratched or damaged 
radiators once they have been fitted. This 
includes any consequential loss or cost of 
fitting. 
If we are not notified within 28 days of the 
date on the signed delivery note then it will be 
deemed that we have fully complied with our 
obligations and claims will not be considered. 
Failure to comply with any of the above 
may invalidate any claims. We recommend 
that after you check the product on delivery 
that it is stored in its packaging to prevent 
damage prior to installation, we cannot 
accept responsibility for items damaged after 
delivery.
For full details of our Terms and Conditions 
please visit www.supplies4heat.co.uk or call 
us on 01342 306880.

Terms & Conditions

This product is guaranteed for 10 years. As we are not the manufacturers of this product 
we will take all reasonable endeavours to make over to you the benefit of any warranty 
or guarantee given by the manufacturer.
The guarantees in all cases are subject to the products being installed in accordance with 
British and or European standards as well as these fitting instructions. The guarantees in 
all cases are restricted to the free of charge replacement or repair of the failed product 
only. Our liability will under no circumstances extend beyond the repair or replacement 
of the product supplied by us. Claims for either labour in replacement or damage to 
property are not admissible. Any goods that are returned, in the event of a problem, 
will belong to us.

Guarantees & Liabilities

1. Unpack & Inspect

This product should have reached you in perfect condition. 
Please carefully unpack and inspect this radiator and 
all fittings. Your point of purchase must be notified of 
any shortages or damage within 28 days of delivery. 

 

 
For further information please see terms and conditions at 
the bottom of the page.

3. Fit Diverter 

(vertical models only)

The diverter can be installed on either end but must be on 
the flow side, it is installed by pushing the cap firmly in the 
waterway, and until it locates against the barrel nipple and 
is retained in place by the bush. Please refer to diagram 
overleaf.

PLEASE NOTE:

 To reduce the possibility of noise caused by rapid heating and cooling 

of aluminium radiators; adequate capacity for expansion must be provided within 
the overall heating system. Systems using micro bore pipework must have adequate 
pressure and flow rates for the number and style of radiators on the system.

www.supplies4heat.co.uk    01342 306880

A brand of                ; Italy’s leading manufacturer of design led radiators.