![Supero SC510-200B Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/supero/sc510-200b/sc510-200b_user-manual_1404933040.webp)
SC510 Chassis Manual
6-2
Rack Precautions
•
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
•
In single rack installation, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from the
rack.
•
You should extend only one component at a time. Extending two or more simul-
taneously may cause the rack to become unstable.
General Server Precautions
•
Review the electrical and general safety precautions that came with the com-
ponents you are adding to your chassis.
•
Determine the placement of each component in the rack.
•
Install the heaviest server components on the bottom of the rack first, and then
work up.
•
Use a regulating, uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
•
Allow the hard drives and power supply modules to cool before touching
them.
•
Always keep the rack's front door, all panels and all components on the servers
closed when not servicing, in order to maintain proper cooling.
Warnings and Precautions!
!
!
Содержание SC510-200B
Страница 10: ...SC510 Chassis Manual 1 4 Notes ...
Страница 38: ...SC510 Chassis Manual 5 16 Notes ...
Страница 46: ...SC510 Chassis Manual A 4 Notes ...
Страница 49: ...B 3 Appendix B Power Supply Specifications Notes ...