Chapter 2
Installation in a Rack
This chapter provides instructions for mounting your chassis in a rack.
2-1 Preparing for Setup
The box in which your system was shipped should include the mounting screws
to mount the system into the rack. Please read this chapter in its entirety before
beginning the installation procedure.
Choosing a Setup Location
Decide on a suitable location for the rack unit that will hold your system. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical
noise and electromagnetic fields are generated. A nearby grounded power outlet.
is required
•
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
•
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and access for servicing.
•
It should be a restricted access location, such as a dedicated equipment room
or a service closet.
Chapter 2: Installation in a Rack
2-1
Содержание SUPERSERVER 5018D-FN8T
Страница 8: ...viii SUPERSERVER 5018D FN8T Manual Notes ...
Страница 14: ...1 6 SUPERSERVER 5018D FN8T User s Manual Notes ...
Страница 22: ...SUPERSERVER 5018D FN8T User s Manual 3 4 Notes ...
Страница 42: ...4 20 SUPERSERVER 5018D FN8T User s Manual Notes ...
Страница 76: ...SUPERSERVER 5018D FN8T User s Manual 6 10 Notes ...
Страница 116: ...A 2 SUPERSERVER 5018D FN8T User s Manual Notes ...
Страница 124: ...C 4 SUPERSERVER 5018D FN8T User s Manual Notes ...