3-15
Chapter 3: Setup and Installation
Notes:
1. All DIMMs must be either all DDR4 DIMMs or DDR4 and AEP/NVDIMM.
2. Populate in furthest slot from CPU if only one DIMM Populated in a channel.
3. Populate in furthest slot from CPU if only one DIMM Populated in a channel.
4. A2,D2,J2,G2 reserved for AEP/NVDIMM
Table 3-2. DIMM Installation CPU2
Number of
DIMMs
CPU2
A1
A2
B1
C1
D1
D2
E1
F1
2
X
3
X
4
X
X
5
X
X
6
X
X
7
X
X
X
8
X
X
X
X
9
X
X
X
X
10
X
X
X
X
11
X
X
X
X
X
12
X
X
X
X
X
X
13
X
X
X
X
X
X
14
X
X
X
X
X
X
15
X
X
X
X
X
X
X
16
X
X
X
X
X
X
X
X
Содержание SuperBlade SBI-4129P-C2N
Страница 1: ...SBI 4129P T3N SBI 4129P C2N SuperBlade Module User s Manual Revison 1 0...
Страница 4: ...SBI 4129P T3N SuperBlade Module User s Manual iv...
Страница 8: ...SBI 4129P T3N C2N SuperBlade Module User s Manual viii Notes...
Страница 30: ...SBI 4129P T3N C2N SuperBlade Module User s Manual 2 18...
Страница 33: ...3 3 Chapter 3 Setup and Installation Figure 3 1 Inserting a Blade into the Enclosure...
Страница 51: ...3 21 Chapter 3 Setup and Installation Figure 3 7 System with M 2 Daughter Card Installed...
Страница 54: ...SBI 4129P T3N C2N SuperBlade Module User s Manual 3 24 Notes...
Страница 62: ...SBI 4129P T3N C2N SuperBlade Module User s Manual 4 8 Notes...
Страница 94: ...SBI 4129P T3N C2N SuperBlade Module User s Manual A 10 Notes...
Страница 96: ...SBI 4129P T3N C2N SuperBlade Module User s Manual 1 2...