
3-3
Chapter 3: Setup and Installation
Figure 3-1. Inserting a MicroBlade Module into the Enclosure
3-3
Onboard Battery Installation
A battery is included on the serverboard to supply certain volatile memory components
with power when power has been removed from the MicroBlade module. If this battery
dies, it must be replaced with an equivalent CR2032 Lithium 3V battery. Dispose of used
batteries according to the manufacturer's instructions. See
for a diagram of
installing a new onboard battery.
Caution:
There is a danger of explosion if the onboard battery is installed upside down,
which reverses its polarities.
Figure 3-2. Installing the Onboard Battery
Lithium Battery
Battery Holder
Содержание MicroBlade MBI-6218G-T41X
Страница 1: ...MBI 6218G T41X MicroBlade Module User s Manual Revison 1 0a...
Страница 4: ...MBI 6218G T41X MicroBlade Module User s Manual iv...
Страница 23: ...2 13 Chapter 2 Standardized Warning Statements...
Страница 28: ...MBI 6218G T41X MicroBlade Module User s Manual 2 18 UL CSA Supermicro UL CSA...
Страница 30: ...MBI 6218G T41X MicroBlade Module User s Manual 2 20...
Страница 44: ...MBI 6218G T41X MicroBlade Module User s Manual 4 8 Notes...
Страница 68: ...MBI 6218G T41X MicroBlade Module User s Manual 5 24 Notes...
Страница 78: ...MBI 6218G T41X MicroBlade Module User s Manual 1 10 Notes...
Страница 80: ...MBI 6218G T41X MicroBlade Module User s Manual 0 2 MBI 6218G T41X...