![Super Circuits CD33-2 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/super-circuits/cd33-2/cd33-2_user-manual_1401761012.webp)
7
www.supercircuits.com
SECTION 2: INSTALLATION
b. If the mounting surface is a very soft material, such as ceiling
tile, place a wood block behind the tile. Screws longer than 1"
may be required. Drill holes for the mounting screws through
the surface and into the wood block.
OR
c. If mounting the camera on a harder surface, such as wood,
drill the mounting screw holes with a 3/32" bit.
5. Determine the cable routing. If the cable is to be routed through
a hole in the mounting location within the coverage of the base,
perform the following steps. If the cable will be routed through a
cable guide in the base,
skip to step 9.
Cable Guide
in Base
CD33W.indd 7
3/30/2010 3:19:25 PM
Содержание CD33-2
Страница 22: ...CD33W indd 17 3 30 2010 3 19 27 PM...
Страница 23: ...CD33W indd 18 3 30 2010 3 19 27 PM...
Страница 24: ...CD33W indd 19 3 30 2010 3 19 27 PM...