Be in charge
Super B
21
Float phase
In this phase the charge voltage is set to UFloat.
Float Phase
Typical
Min
Max
U
Float
13.8V DC
13.6V DC
14V DC
Table 14. Float Phase
Maintenance phase
If supported by the charger, every t3 hours the charger can do a maintenance charge to
make sure that the batteries are kept fully charged.
Maintenance Phase
Typical
Max
Time
1 year
2 years
Table 15. Maintenance phase
6. Inspection, cleaning and maintenance
6.1. General information
!
Warning!
Never attempt to open or dismantle the Li-ion battery! The inside of the Li-ion
battery does not contain serviceable parts.
1. Disconnect the Li-ion battery from all loads and charging devices before performing cleaning
and maintenance activities (see paragraph 4.6).
2. Place the enclosed protective caps over the terminals before cleaning and maintenance
activities to avoid the risk of contacting the terminals.
6.2. Inspection
1. Inspect for loose and/or damaged wiring and contacts, cracks, deformations, leakage or
damage of any other kind. If damage to the Li-ion battery is found, it must be replaced by a
professional. Do not attempt to charge or use a damaged Li-ion battery. Do not touch the
liquid from a ruptured battery.
2. Consider replacing the Li-ion battery with a new one if you note either of the following
conditions:
-
The battery run time drops below 80% of the original run time.
-
The battery charge time increases significantly.
Содержание SB12V10P-DC
Страница 1: ...Manual STARTER BATTERIES 12 7V Lithium Iron Phosphate Version May 2018 ...
Страница 27: ...Be in charge Super B 27 Appendix I Declaration of Conformity ...
Страница 28: ...28 ...