Sunways NTX3000 Скачать руководство пользователя страница 2

Copyright Declaration

Copyright @ 2011 SUNWAYS AG. All rights reserved.
No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by 
any means, electronic, mechanical, photographic, magnetic or otherwise, without the prior written permis-
sion of SUNWAYS AG.

SUNWAYS AG makes no representation, express or implied, with respect to this documentation or any of the 
equipment and/or software it may describe, including(with no limitation) any implied warranties of utility, 
merchantability, or fitness for any particular purpose. All such warranties are expressly disclaimed. Neither 
SUNWAYS AG nor its distributors or dealers shall be liable for any indirect, incidental, or consequential dam-
ages under any circumstances. (The exclusion of implied warranties may not apply in all cases under some 
statutes, and thus the above exclusion may not apply.) 

Specifications are subject to change without notice. Every attempt has been made to make this document 
complete, accurate and up-to-date. Readers are cautioned, however, that SUNWAYS AG reserves the right to 
make changes without notice and shall not be responsible for any damages, including indirect, incidental or 
consequential damages, caused by reliance on the material presented, including, but not limited to, omis-
sions, typographical errors, arithmetical errors or listing errors in the content material.

All trademarks are recognized even if these are not marked separately. Missing designations do not mean 
that a product or brand is not a registered trademark.

SUNWAYS AG
Max-Stromeyer-Strasse 160, 
D-78467 Konstanz, Germany 
E-mail: [email protected]
www.sunways.de.

Содержание NTX3000

Страница 1: ...User Manual Sunways Solar Inverter NTX 3000 4000 5000 6000 english EN...

Страница 2: ...m ages under any circumstances The exclusion of implied warranties may not apply in all cases under some statutes and thus the above exclusion may not apply Specifications are subject to change withou...

Страница 3: ...ituation which if not avoided will result in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION CAUTION indica...

Страница 4: ...ual Before connecting the NTX to the electrical utility grid contact the local utility company This connec tion must be made only by qualified personnel Warning of the NTX must be made by qualified pe...

Страница 5: ...re 10 Interconnection code compliance 10 FCC compliance 10 2 2 Safety instructions 11 2 3 Installation overview 11 3 Unpacking and inspection 12 3 1 Scope of delivery 12 3 2 Product label 13 4 Mountin...

Страница 6: ...or 4 PV arrays NTX 4000 5000 6000 28 Connection to 1 PV array or 2 PV arrays NTX 3000 28 5 5 Communication wiring 29 6 Commissioning 31 7 Display and messages 32 7 1 LED indicators 32 7 2 Available D...

Страница 7: ...5 10 1 FCC compliance information 45 10 2 NTX wiring diagrams 46 NTX connections for 208 V and 240 V AC grids 46 NTX connections for 277 V AC grids 46 10 3 Technical data 47 10 4 Trip limits trip time...

Страница 8: ...1 2 Target group This manual is for qualified personnel Qualified personnel have received training and have dem onstrated skills and knowledge in the construction and operation of this device Qualifie...

Страница 9: ...educes the power needed from the utility Excess power may actually spin the utility meter backwards depending on the type of meter in you system This power may also be recorded as power credits by the...

Страница 10: ...TX 6000 the AC fuses are optional installed in the unit When not provided with the unit it should be provided at end installation Operating temperature The NTX has been designed to maintain full power...

Страница 11: ...includes configuration of AC voltage and DC input channel guidelines for selecting the correct wire size cautions and warnings that you should follow to avoid injury and or equipment damage and step b...

Страница 12: ...as delivered CAUTION Failing of the NTX may cause injuries Crushing of body parts will result in injuries Take the weight of the NTX of 60 6 lbs 27 5 kg into account when mounting If you need assistan...

Страница 13: ...3 Unpacking and inspection 13 3 2 Product label The product label provides basic information of the inverter Pay special attention to the type of inverter and other specifications...

Страница 14: ...tion damage to the package or its contents is always a possibility The customer is encouraged to perform the follow ing checks Inspect the shipping box for apparent damage such as holes cracking or an...

Страница 15: ...e processed or the location where feed lots of poultry Far away from the television antenna or antenna cable Choose a location that allows unobstructed air flow around the inverter Allow sufficient ro...

Страница 16: ...should be about 45 mm and should be the same After removing the dust in the holes mea sure the net depth of the holes If the depth is more than 50 mm or less than 40 mm the expan sion tubes wouldn t b...

Страница 17: ...ter as shown in the following figure The inverter should be hung onto the bracket using the hook D and the hole F that need to be well inserted into their counterparts C and E D connects to C and F co...

Страница 18: ...4 Mounting 18 5 Lock the inverter and the bracket with lock for safety Lock the inverter 6 Complete the installation process...

Страница 19: ...wiring WARNING Always respect the normal ratings of voltage and current defined in section 10 Technical data see page 45 when designing your system Please observe these considerations in designing th...

Страница 20: ...mmunication knockouts water tight plug size M20 WARNING The AC and DC knockouts are sized for 1 in con duits and the communication knockouts are sized for 1 2 in rigid conduits Do not enlarge the knoc...

Страница 21: ...PPT2 DC1 8 PV2 MPPT2 DC2 9 3 AC 3 10 2 AC 2 11 1 AC 1 12 PE Cabinet Grounding RS485 RJ45 Pin Definition Code Name Description 1 1 RS 485 TX 2 2 RS 485 TX 3 3 RS 485 RX 4 6 RS 485 RX RS485 Signal Lock...

Страница 22: ...8 90 5 08 45 NTX 5000 AC field wiring terminals 6 8 90 1 69 15 DC field wiring terminals 8 12 90 1 69 15 Grounding Electrode 6 8 90 5 08 45 NTX 4000 AC field wiring terminals 6 10 90 1 69 15 DC field...

Страница 23: ...ect the wiring in the reverse order from above 5 2 Opening wiring cover of NTX inverter 1 Remove the 2 screws from the wirng cover and pull the cover forward smoothly 2 Put the cover the screws to one...

Страница 24: ...d Volt Fault If this error message is encountered recheck the output voltage configuration and confirm that it is set property AC voltage configuration The NTX may be easily configured for the differe...

Страница 25: ...r with the appropriate locknut 6 Install a 1 in conduit between the main breaker disconnect box and the NTX inverter AC Grid knockout 7 Pull the AC wires through the conduit from the interior of the b...

Страница 26: ...exceed 17 5 A DC for each input channel NTX 6000 14 5 A DC NTX 5000 11 A DC NTX 4000 NTX 3000 can only be configured as one MPPT and the max current for DC input channel shall not exceed 17 5 A DC Co...

Страница 27: ...ed on the type of PV array input by section Pin Definition see page 21 section Parallel Connection to 2 PV arrays NTX 4000 5000 6000 see page 28 section Two MPPTS connection to 2 PV arrays or 4 PV arr...

Страница 28: ...PV 1 PV 2 PV 2 PV 2 PV 2 Two MPPTS connection to 2 PV arrays or 4 PV arrays NTX 4000 5000 6000 WARNING If the inverter configured as two individual MPPTs connect to two PV arrays the max current for...

Страница 29: ...Ethernet 2 3 PV 1 PV 1 PV 1 PV 1 PV 2 PV 2 PV 2 PV 2 5 5 Communication wiring 1 Remove the covers on RS485 and Ethernet knockouts 2 Install two 1 2 in conduit fitting in the RS485 and Ethernet knockou...

Страница 30: ...nection procedure of NTX inverter see page 20 NOTE When using a third party RS485 cables to connect the inverters attach the supplied ferrite cores to the RS485 cables as shown NTX supply two ways to...

Страница 31: ...tem check routine 5 If no AC fault is detected the NTX will enter the Checking mode and the NTX will begin to run normally At the same time the green LED will keep flashing and the LCD enter the defau...

Страница 32: ...rm LED indicates that the inverter has detected a fault or alarm condition If the alarm condition detected the yellow LED keeps flashing until the inverter go to the normal state If the fault conditio...

Страница 33: ...of energy trans ferred to the grid Total lifetime counter of energy transferred to the grid Last 50 fault conditions with error code and time stamp Last 50 start and stop time of energy transferred to...

Страница 34: ...and four options Running Settings Event Service The line of LCD has the icon means your option You can choose your option manually by pressing the or key If you want enter the option which has the ic...

Страница 35: ...ay 000 0 KWh T day Today s lifetime counter of energy transferred to the grid E day Today s energy transferred to the grid T mon 000 0 h E mon 000 0 KWh T mon This month s lifetime counter of energy t...

Страница 36: ...Press the or key to scroll screen and select your parameter Press the OK key to confirm your selection If your selection become operative the LCD will give the message Setting OK Or else the LCD will...

Страница 37: ...l2 83 9960 Tvh2 83 498 Tvh1 83 498 Tvl1 83 Operation guide Press the or key to scroll screen and select your submenu Press OK key to enter the setting mode which you selected Press the key to scroll n...

Страница 38: ...nter settings menu and correct it Date 31 12 2000 Time 00 00 00 Operation guide Press the or key to scroll screen and select your submenu Press the OK key to enter the setting mode which you selected...

Страница 39: ...the previous menu by pressing the ESC key 2 Operation Log This submenu is some part and stop time logs of the inverter You can query last 50 start and stop time of energy transferred to the grid The s...

Страница 40: ...en doing so or hire a qualified professional If the system problem persists contact Sunways technical support at Tel 49 0 753199677 0 Email info sunways de In order to better assist you when contactin...

Страница 41: ...Over frequency or Under frequency PV1 Volt Fault 03 PV1 Input Under voltage or Over voltage Check whether the output voltage of PV array is in the allowing range Check whether the insulation of PV cab...

Страница 42: ...change ISO Fault 16 ISO abnormity Check whether the output voltage of PV array is in the allowing range Check whether the insulation of PV cable is good Inspect whether the installation is correct acc...

Страница 43: ...the allowing range Check whether the insulation of PV cable is good Inspect whether the installation is correct according to the manual If still at fault please ask for help System Fault 25 System Fau...

Страница 44: ...onnections 3 Wait for the fan to stop rotating 4 Screw up 4 screws on the fan screen and remove it carefully because the fan mounted behind and the cables are not so long 5 The fans are fastened with...

Страница 45: ...used in accor dance with the instructions or it may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If t...

Страница 46: ...round PV PV PV PV N L1 L2 PE OFF Breaker Size 2p 50 Amp AC Distribution Panel Earth Ground Utility ON L1 L2 Main Ground Neutral NTX connections for 277 V AC grids AC Switch PV Array Equipment Ground P...

Страница 47: ...nge at 208 V nominal AC operating voltage range at 240 V nominal AC operating voltage range at 277 V nominal AC operating frequency range AC frequency nominal AC maximum continuous output power AC max...

Страница 48: ...Noise emission 380 580 203 mm 15 23 8 8 in 57 3 lbs 26 kg 60 6 lbs 27 5 kg 64 lbs 29 kg 66 lbs 30 kg 40 dB A General data Inverter technology Cooling concept True sine transformerless Natural Natural...

Страница 49: ...9 2 V default 228 8 V Adjustable 0 16 s 10 s default 0 83 s 120 Adjustable 109 2 V 124 8 V default 124 8 V Adjustable 218 4 V 249 6 V default 249 6 V 0 01 s 240 V 50 Adjustable 60 0 V 114 0 V default...

Страница 50: ...ble 152 4 V 263 2 V default 243 8 V Adjustable 0 16 s 10 s default 1 67 s 110 Adjustable 290 9 V 318 6 V default 304 7 V Adjustable 0 16 s 10 s default 0 83 s 120 Adjustable 290 9 V 332 4 V default 33...

Страница 51: ...have any questions about NTX inverter please call service support hotline 49 0 753199677 0 Please keep following information to better our service for you Inverter s Model Inverter s Serial No Commun...

Страница 52: ...12 Notes 52 12 Notes...

Страница 53: ...12 Notes 53...

Страница 54: ...12 Notes 54...

Страница 55: ...C F Kommunikation und Dokumentation Villingen Schwenningen www cundf de...

Страница 56: ...otovoltaic Technology Max Stromeyer Strasse 160 D 78467 Konstanz Telefon 49 0 7531 996 77 0 Fax 49 0 7531 996 77 444 E Mail info sunways de www sunways de Technische Hotline 49 0 7531 996 77 577 SD131...

Отзывы: