![SUNWARD SWE20F 2019 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/sunward/swe20f-2019/swe20f-2019_operation-and-maintenance-manual_1401100034.webp)
32
2)
Every 8-hour operation or everyday
Carry out the 8-hour operation or everyday maintenance.
Pay attention to liquid leakage.
In the first 100-hour or when work in mud, lubricate the pivot of working instrument every
other 8 hours’ operation.
3)
After first 50-hour operation
Carry out 50-hour operation maintenance.
Check the torque of detectable fastener.
4)
After first 100-hour operation
Carry out 50-hour and 100-hour maintenance.
3.3 OPERATE ENGINE
Daily inspection
1)
Electric system
Check whether there are abraded or cracked wire and
slack connector or not, and check whether the light
can be turned on or off normally.
2)
Boom, arm, bucket, dozer blade, sheet metal,
track shoe
Check whether there are curving, damaged and lost
parts or not.
3)
Fastener
Check whether there are slack or lost parts or not.
4)
Fuel system
Drain water and sediment from the fuel tank.
5)
Hydraulic system
Check leakage, hose twist, abrasion between pipe and hose or other parts.
6)
Lubrication
Check the appointed lubrication points listed in the periodic maintenance table.
7)
Protection device
Check shield and mud shield.
8)
Safety
FIG. 3-1
Содержание SWE20F 2019
Страница 101: ...99 8 ATTACHMENT 8 1 20FNELECTRIC DRAWING...
Страница 102: ...100 8 2 20FHYDRAULIC DRAWING...