MAX | User Manual
66
The inverter must be installed by a qualified / licensed electrical engineer in accordance to the countries
wiring regulations.
Before switching on, the installation engineer must have completed the Earth Bond, RCD and earth leakage
tests, checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage.
Power ON Sequence:
1. Switch on AC
2. Press Start Button
3. Switch on Battery and battery breaker
4. Switch on the DC (PV Isolator)
Shutdown Sequence:
1.
Switch off AC
2. Press the start button
3.
Switch off the battery and the battery breaker
4.
Switch off the DC (PV isolator)
7. COMMISSIONING
7.1. Start-Up / Shutdown Procedure
Содержание SUNSYNK MAX
Страница 4: ...MAX User Manual 4 APPENDIX A 68 APPENDIX B 69 APPENDIX C 69 APPENDIX D 69 APPENDIX E 70...
Страница 9: ...MAX User Manual 9 2 1 Product Size...
Страница 17: ...MAX User Manual 17 4 5 Function Port Definition for neutral earth bonding...
Страница 21: ...MAX User Manual 21...
Страница 23: ...MAX User Manual 23 4 9 1 Recommended AC Surge Protector...
Страница 27: ...MAX User Manual 27 4 13 Wiring System for Inverter...
Страница 32: ...MAX User Manual 32 4 18 Diesel Generator Connection Diagram...
Страница 63: ...MAX User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator...
Страница 64: ...MAX User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple...
Страница 65: ...MAX User Manual 65...
Страница 71: ...Ltd wered by Po...