SunSynk SUN-BATT-5.12R Скачать руководство пользователя страница 3

  

 

  

 

 

 

 

 

 

 

Page | 3

SUN-BATT-5.12R | Installer Manual

  

 

  

 

 

 

 

 

 

 

1.  TECHNICAL DATA

Performance

Nominal Voltage

51.2 Vdc

Nominal Capacity

100Ah

Battery Energy1

5120 Wh

Charge Voltage

55.68~56.16Vdc

Discharge Voltage

45.6-56.16 Vdc

Nominal Charge/Discharge Current

50A

Nominal Charge/Discharge Power

2500W

Max Charge / Discharge Current

100A

Max Charge / Discharge Power

5000W

Short Circuit Current

350A

Communication

Display

SOC status indicator, LED indicator

Communication

RS232, RS485, CAN

General Specification

Dimension( W×D×H mm )

440×550×130mm

Weight (Kg)

49kg

Installation

Rack-Mounted, Wall-Mounted or 

 Cabinet-Mounted

Working Temperature2

-20ºC ~ 60ºC

Storage Temperature

≤25ºC,  12  months                                                           

≤35ºC,  6  months                                             
≤45ºC, 3 months                               

Operating / Storage / humidity

≤ 95%RH

Max Operating Altitude

≤ 2000m

IP Rating

IP20

Cell Technology

LiFePO

4

, Lithium-ion Phosphate

Cycle life3

6000 Cycles @ 80% DOD / 25ºC / 0.5C, 

60% EOL

Scalability

Max 8 batteries in parallel

Warranty

5 years

Standard Compliance

 Certification

UN38.3, IEC62619, IEC61000, UL 1642(cell)

(more available upon request)

Ordering and Deliverable Part

Product ordering part

SUN-BATT-5.12R Battery 

SUN-BATT-5.12R Power cable 

SUN-BATT-5.12R Parallel cable

Содержание SUN-BATT-5.12R

Страница 1: ...v 2 09 30 22 Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales globaltech china com SUN...

Страница 2: ...ounted Accessory Deliverables 9 3 2 2 Wall Mounted Accessory Deliverables 10 3 3 Tools 11 3 4 Installation Requirements 11 3 4 1 Installation Environment Requirements 11 3 4 2 Installation Carrier Req...

Страница 3: ...ification Dimension W D H mm 440 550 130mm Weight Kg 49kg Installation Rack Mounted Wall Mounted or Cabinet Mounted Working Temperature2 20 C 60 C Storage Temperature 25 C 12 months 35 C 6 months 45 C...

Страница 4: ...tery temperature 1 Test conditions 100 depth of discharge DoD 0 2C rate charge discharge at 25 C 2 Charge discharge derating occurs when the operating temperature from 10 C to 5 C 45 C to 55 C 3 Condi...

Страница 5: ...Page 5 SUN BATT 5 12R Installer Manual 1 1 2 Wall Mounted SUN BATT 5 12R 1 1 3 Cabinet Mounted SUN BATT 5 12R...

Страница 6: ...l at most 2 1 Brief Introduction 2 2 Interface Introduction 2 2 1 Switch ON OFF Switch ON For single SUN BATT 5 12R switch ON rocker switch then long press more than 3 seconds ON OFF button on front p...

Страница 7: ...OFF Stop discharge Fault OFF Light OFF OFF OFF OFF OFF OFF Stop charging and Discharge Charging Battery Level Indicators Instructions Status Charging Battery Level Indicator L8 L7 L6 L5 L4 L3 L2 L1 B...

Страница 8: ...ion Pin 1 Pin 8 RS485 B to PCS reserved Pin 2 Pin 7 RS485 A to PCS reserved Pin 3 NC Pin 4 CANH to PCS Pin 5 CANL to PCS Pin 6 GND 2 2 4 RS232 Port RS232 Communication Terminal RJ45 port follow RS232...

Страница 9: ...or damage such as holes and cracks If any damage is found do not unpack the battery and contact the dealer as soon as possible You are advised to remove the packing materials within 24 hours before in...

Страница 10: ...Battery 2 4PCS Support frame 3 12PCS M4 8 4 8PCS M6 50 5 1PCS Manual 6 1PCS Test report 7 1PCS Certificate 3 2 2 Wall Mounted Accessory Deliverables NO Pictures Quantity Description 1 2PCS Hanging bra...

Страница 11: ...rements Install the battery in the indoor environment Place battery in secure location away from children and animals Do not place the battery near any heat sources and avoid sparks Do not expose the...

Страница 12: ...Page 12 SUN BATT 5 12R Installer Manual 3 5 1 Dimensions 3 5 Installation Instructions...

Страница 13: ...staller Manual 3 5 2 Installation Steps Rack Mounted STEP 1 Remove the handle from the battery STEP 2 Install Support frames at the four corners of the battery STEP 3 The battery with the support fram...

Страница 14: ...BATT 5 12R Installer Manual 3 5 3 Installation Steps Wall Mounted Minimum mounting distance requirement Wall Mounted STEP 1 Drill the hole with an 10mm drill bit as follows and fix the wall bracket t...

Страница 15: ...Page 15 SUN BATT 5 12R Installer Manual STEP 2 Install the wall hanging bracket STEP 3 Hang the machine on the wall hanging back plate and tighten it...

Страница 16: ...BATT 5 12R Installer Manual Page 16 4 BATTERY POWER AND COMMUNICATION CONNECTIONS 4 1 Wiring Steps STEP 1 Connect the battery to ground STEP 2 Connect the battery power line STEP 3 Connect the communi...

Страница 17: ...able Wiring Instructions The connection to the protection devices should use the P terminal from the Mas ter pack and the P terminal from the last Slave pack The Master battery can automatically ident...

Страница 18: ...Page 18 SUN BATT 5 12R Installer Manual 4 2 3 Wiring Diagram for Parallel Cascade Connection When multiple batteries are connected in parallel follow the following wiring mode...

Страница 19: ...umidity of Storage Environment Storage Time SOC Below 10 C prohibit 10 25 C 5 70 12 months 30 SOC 60 25 35 C 5 70 6 months 30 SOC 60 35 45 C 5 70 3 months 30 SOC 60 Above 45 C prohibit 5 2 Recharge Re...

Страница 20: ...g 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel HK 852 2884 4318 Fax 852 2884 4816 Tel UK 44 151 528 9945 Tel SA 27 1108 39837 sales globaltech china com Audio Training manuals on Apple Pod Cast...

Отзывы: