3. OPERATION INSTRUCTION
3.1. Checking and Debugging
Check before power on. Please make sure to check the below items carefully:
◼
There are no external objects or parts left inside or on the top of the EV charger;
◼
EV charger and accessories are correctly connected and firmly installed
;
◼
The installation position of the EV charger is convenient for operation and maintenance
;
◼
The selection of the upper AC leakage protection switch at the inlet wires of the charging pile is
reasonable.
3.2. Power On
a) Confirm that the above inspection items meet the requirement;
b) After the circuit breaker of the upper distribution box is closed, open the upper cover of the charging
pile and close the leakage protection circuit breaker.
c) The AC charging pile is powered on and self-tested.
d) After power on and self-tested, check led indicator status.
◼
Standby: Power indicator always on
◼
Device failure: Fault indicator is always on
3.3. Operation
3.3.1. Charging Connection
After the driver parked the vehicle, please make sure it is plugged in place and connected reliably.
The network version can support the app/Wechat Scan code for charging and swipe the IC card for
charging.