background image

Website: www.sunsynk.com    E-mail: [email protected]

                             

        

 

3. OPERATION INSTRUCTION 

 
 

3.1. Checking and Debugging 

 

Check before power on. Please make sure to check the below items carefully: 

 

There are no external objects or parts left inside or on the top of the EV charger; 

 

EV charger and accessories are correctly connected and firmly installed

 

 

The installation position of the EV charger is convenient for operation and maintenance

 

 

The selection of the upper  AC leakage protection  switch at the inlet wires of the charging pile is 
reasonable. 

 
 

3.2. Power On 

 

a) Confirm that the above inspection items meet the requirement; 
b) After the circuit breaker of the upper distribution box is closed, open the upper cover of the charging 

pile and close the leakage protection circuit breaker. 

c)  The AC charging pile is powered on and self-tested. 
d) After power on and self-tested, check led indicator status. 

 

 

Standby: Power indicator always on 

 

Device failure: Fault indicator is always on 

 
 

3.3. Operation 

 

3.3.1. Charging Connection 

 
After the driver parked the vehicle, please make sure it is plugged in place and connected reliably. 
 

 

 
The  network  version  can  support  the  app/Wechat  Scan  code  for  charging  and  swipe  the  IC  card  for 
charging. 
 
 

Содержание SUN-7KW-EV2

Страница 1: ...ing Station SUN 7KW EV2 USER MANUAL Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales gl...

Страница 2: ...W 4 2 2 PRINCIPLE BLOCK DIAGRAM 4 2 3 KEY PARAMETERS 5 2 4 PRODUCT FEATURES 5 3 OPERATION INSTRUCTION 6 3 1 CHECKING AND DEBUGGING 6 3 2 POWER ON 6 3 3 OPERATION 6 3 3 1 CHARGING CONNECTION 6 3 3 2 ST...

Страница 3: ...y cloth It is strictly prohibited to touch the charging gun core with hands when it is electrified Do not attempt to dismantle repair modify the charging pile If there is any need for maintenance or m...

Страница 4: ...arging It is composed of a charging body wall hanging rear plate floor standing pole optional accessories etc It features charging protection card charging scan code charging mobile payment network mo...

Страница 5: ...ctions Over Under voltage protection over current protection short circuit protection ground protection lightning protection emergency stop protection leakage protection Functions Ethernet GPRS 4G Wif...

Страница 6: ...f the charging pile is reasonable 3 2 Power On a Confirm that the above inspection items meet the requirement b After the circuit breaker of the upper distribution box is closed open the upper cover o...

Страница 7: ...The user connects the charging gun correctly and uses the configured card to enter charging After the charging is finished please scan the card for payment first and then plug out the gun otherwise th...

Страница 8: ...he charge and deliver the charging data including charging time charging amount charging cost to the owner s APP or the bound WeChat public number The owner can also view the historical consumption re...

Страница 9: ...m cannot be eliminated please contact us AC over current AC input current is higher than standard 1 Immediately disconnect the leakage over current protection circuit breaker of the distribution box 2...

Страница 10: ...Input output poor grounding or input L N reverse connection 1 Disconnect the distribution box leakage over current protection switch immediately 2 Check whether the AC pile input output line is groun...

Отзывы: