SunPower Equinox™
Installation Quick Start Guide
Specifications
© 2019 SunPower Corporation. All rights reserved. SunPower, the SunPower logo, Equinox™,
and InvisiMount™ are trademarks or registered trademarks of SunPower Corporation. All
other trademarks are the property of their respective owners.
533528 RevA
13. Install cable management clips on module frames as shown.
14. Transport modules to roof.
15. Remove the microinverter (MI) serial number sticker
and place it on your array layout diagram (ALD).
16. Remove the module serial number sticker and place it
on your ALD.
17. On each module, carefully raise the MI away from the backsheet
until each side clicks into position.
18. Position the first module of first row (the lower row in
a two-row array) on the rails, connect the trunk cable, and align the
module on the rails with the marked array footprint.
19. Attach the end clamps to the first module.
20. Place the second module next to the first, raise its MI,
and connect the trunk cable. Add mid clamps.
21. Continue installing modules till the end of the row,
cutting rails as necessary for the last module.
22. Complete wire management of the first row by fitting
the trunk cable into the pre-positioned cable clips.
23. Install two row-to-row spacers per module, on the
upper edge of each of the first row's modules.
24. Install the second (upper) row by repeating
Steps 15
–
21 of this QSG.
25. Install a row-to-row grounding clip between the two
rows, at one end of the array.
If you need to make a connector:
1. Slide the nut over the cut cable end.
2. Ensure that the grommet is in place inside
the cover, and then slide the cover over the
cable end.
3. Remove 1 1/16
”
from the cable's outer
sheathing.
4. Strip 3/8
”
from the red conductor and from
the black conductor.
5. Load the two terminals into the 12 GA slot of
crimp tool, flush with the slots.
6. Fit the exposed conductors into the
terminals and crimp them
—
DO NOT CRIMP
OVER THE INSULATION!
7. Insert the terminals into the connector body
until each clicks into place, and then tug on
them to ensure they are secure.
8. Slide the cover over the body until you feel it
click into place.
9. Tighten the nut to 62 in-lb (7 N-m).
Important!
When the connector is fully
assembled, the cable outer sheathing must
extend completely through the gasket inside
the cover, and the gasket must fully cover the
sheathing in order to prevent moisture from
entering the connector.
Note:
For non-standard cable
transitions use a 90° clip.
E-Series and X-Series AC Modules
A-Series AC Modules
OR