background image

are connected properly.

ASSEMBLY PICTURES

ASSEMBLY INSTRUCTIONS 

DO NOT allow the pump to run dry!

Be careful not to spill water onto the plug of the pump.

Fig 1

Fig 2

Step 1: Place the base on a level surface.pls refer to fig.1
Step 2: Insert the topper to the base.pls refer to fig.2
step 3:Lay the pump in the second base,connect the pump to the water tube,make sure the connection is tight,pls 
refer to fig.3
step 4:Put the solar panel on the topper,make sure the wire of solar panel would throught the small hole of the 
topper base,connect the solar panel wire to the wire of pump,make sure the connection is tight,pls refer to fig.4

Fig4

Fig 3

Отзывы: