
6
We value your experience using Sunny Health and Fitness products. For assistance with parts or
troubleshooting, please contact us at [email protected] or 1-877-90SUNNY
(877-907-8669).
STEP 3:
Remove 2
Wave Washers (No. 63)
, 2
Hex
Bolts (No. 25)
and 2
Flat Washers (No.
26)
from the long axle of the
Handlebar
Post (No. 9)
with
Spanner (No. 100)
. Then
attach the 2
Swing Bars (No. 24L/R)
to the
long axle of the
Handlebar Post (No. 9)
with 2
Wave Washers (No. 63)
, 2
Hex
Bolts (No. 25)
and 2
Flat Washers (No.
26)
that were just removed with
Spanner
(No. 100)
.
NOTE:
Please do not fully tighten at this
time.
Attach the
Connecting Joint
(No. 107)
to
the left side of
Crank Arm (No. 106)
with 1
Left Hinge Bolt (No. 105L)
, 1
Wave
Washer (No. 61)
. Turn the
Left Hinge Bolt
(No. 105L)
counter-clockwise
as tightly as
you can with your hand. Secure by
tightening 1
Spring Washer (No. 39)
and 1
BLACK color
Left
Nylon Nut (No. 40L)
clockwise
. Then use
Allen Wrench (No.
103)
and
Spanner (No. 101)
to tighten
securely.
Attach the
Connecting Joint (No. 107)
to
the right side of
Crank Arm (No. 106)
with
1
Right Hinge Bolt (No. 105R)
, 1
Wave
Washer (No. 61)
. Turn the
Right Hinge
Bolt (No. 105R)
clockwise
as tightly as you
can with your hand. Secure by
tightening 1
Spring Washer (No. 39)
and 1 WHITE
color
Right
Nylon
Nut
(No.
40R)
counter-clockwise
. Then use
Allen Wrench
(No. 103)
and
Spanner (No. 101)
to tighten
securely.
NOTE
: Please do not fully tighten at this
time. Please attach the
Hinge Bolts (No.
105L/R)
correctly as Fig.1 showed.
Remove 2
Hex Bolts (No. 21)
, 2
Flat
Washers (No. 22)
and 2
Nylon Nuts (No.
23)
from
2
Pedal Support Tubes (No.
18L/R)
.
Then attach the 2
Swing Bars (No.
24L/R)
to the 2
Pedal Support Tubes (No.
18L/R)
with 2
Hex Bolts (No. 21)
, 2
Flat
Washers (No. 22)
and 2
Nylon Nuts (No.
23)
that were just removed. Tighten and
secure with
Spanner (No. 100)
and
Spanner (No. 104)
.
NOTE
: If fail to screw in
Hex Bolts (No.
21)
, please move the
Crank Arm (No. 106)
to a different angle and retry it.
Fasten 2
Hex Bolts (No. 25)
and 2
Nylon
Nuts (No. 40L/R)
tightly now. Then cover
with the 12
Nut Caps (No. 20 & No. 58 &
No. 57 & No. 41)
.
Fig.1
Содержание SF-E322002
Страница 3: ...2 PRE ASSEMBLY CHECK LIST Before you start to assemble please make sure all parts are included ...
Страница 16: ...15 EXPLODED DIAGRAM 1 EXPLODED DIAGRAM 2 ...
Страница 18: ......