Fig.2:
Insert connecting piece
of big top frame (E) into
pentagon tube, then locked
wirth knob (I).
Fig.3:
Insert connector of
arch beam (C) into post (A).
Fig.4:
Insert upper side of
arch beam (C) into
connector of big top frame
(E).
Fig.6:
Insert connector of
middle
beam (D) into
middle tube of horizontal
screen (B).
Fig.5:
Insert upper side of
middle beam (D) into middle
connector of big top frame
(E). Then put on big canopy
(K). Do not spread out.
Fig.7:
Insert hook (H) into
small top connector (G),
then insert small top arch
beam (F) into small top
connector (G).
Fig.8:
Insert down
connector of small top
arch beam (F) into big
top frame (E).