HH
Φ
8X260MM Peg
16 PCS
GG
Plastic tie
104 PCS
Hardware Pack 3
Fig.7:
Attach Corner connector (H) to Pole (A) by using Bolt (AA) and Flat washer (BB).
Fig.8:
Hang up the Hook (X) to Big Top Connector (Q). Then Insert Big top beam (L), Long side beam (N)
and Short side beam (M) into Big top connector (Q).
Fig.9:
Insert
Big top beam (L) into Corner connector (I).
Fig.10:
Attach Side beam M (N) to Side beam connector (J) by Bolt (EE), Flat washer (BB) and Nut (FF).
Fig.11:
Insert Small top bar (S) into Small top connector (R). Put on the Small canopy (T).
Fig.12:
Put on the Large canopy (U), do not spread. Attach the small top to Big top beam (L) by Bolt (EE),
Flat washer (BB), Nut (FF).