7
Hardware Pack 3
GG
Stake
¢
6 x 180
12pcs
Fig.19:
Connect Stake (GG) and Base (K) to ground.
Fig.20:
Connect Mosquito Netting (N) and Curtain (O) to Mosquito Netting Hook (JJ).
(Note: Mosquito Netting should be inside, Curtain should be outside.)
Fig.21:
Set the
Big
Canopy (M1), insert the hooks into the grooves on the outside of the beam.