Fig.21-1:
Attached Side stay (V1, V2) to Post (A1, A2) with Bolt (CC) and Flat Washer (BB).
Fig.21-2:
Slid 1pc Plastic Ring (EE) to be inside of Stay 1(V1), then use Bolt (GG) and Washer (BB) to lock
top of Side Stay 1(V1), Decorative slot 1(C1) and Side beam 2(B2) together. Repeat this step,
lock Side Stay 2 (V2), Decorative slot 2(C2) and Side beam 1(B1) together.
Fig.23:
Raise the post base cover 1 (P1) and assemble ground spike (KK) to the ground through the
post base 1(O1)
Fig.24:
Raise the post base cover 2 (P2) and assemble ground spike (KK) to the ground through the
post base 2(O2) .
Fig.25:
Secure the gazebo to the curtain by using bolt (LL) through curtain-mounting bracket (Q), and
screw the bolts in the curtain-mounting bracket (Q).
Fig.21-4:
Use Bolt (GG) and Washer (BB) to lock Side Stay (V4, V3) onto Back beam (E1, E2).
Fig.22:
Hang Curtain (W) on outside line of Plastic Ring (EE), and hang Mosquito Net(Y) on the
inside line of Plastic Ring (EE).
Fig.21-3:
Attach Side Stay 3/4 (V3/V4) to Back Post 1/2 (A3/A4) with Bolt (CC) and Flat Washer (BB).