October 16 (
实际生产日期
)
Made in China
2 / 3
Parts List
Part #
Description
QTY
A
Tub body
BT0022XX101
1
B
Ring 1
BT0022XX102
2
C
Leg (upper)
BT0022XX103
3
D
Tray
BT0022XX104
1
E
Leg (lower)
BT0022XX106
3
Parts List
Part #
Description
QTY
AA
Bolt M6*10
SM06010C
9
BB
Washer M6
TD06C
9
ASSEMBLY STEPS
Care & Maintenance
Fig.1: Insert Leg (Upper) (C)
into Leg (lower) (E) and
secure them with Bolt (AA)
and Washer (BB).
Fig.2: Attach Ring (B) to Leg
(lower) (E) with Bolt (AA) and
Washer (BB).
Fig.3: Attach Ring (B) to Leg
(upper) (C) with Bolt (AA)
and Washer (BB).
Fig.4: Place Tray (D) onto
Lower ring. Tub (A) onto
Upper ring.
Fig.5: Place Tub body (A) onto
Ring 1 (B).
Now your tub is ready to us
Fig.5
Fig.4