Fig 1:
Insert Tilt Beam 1 (B1) to Top Screen (A), and tighten them with Baffler (B3) by Bolt (AA) and Flat Washer (BB).
Use the same way for Tilt Beam (B2). Then tighten Upper Connection Pole (C1) to it by Bolt (AA) and Flat Washer
(BB) (Side with mark “UP” up)
Fig 2:
Tighten one end of Lower Connection Pole (C2) to Tilt Beam 1 (B1), the other end of Lower Connection Pole
(C2) to Tilt Beam 2 (B2), with
Bolt (AA) and Washer (BB).
Fig.3:
Attach Top Hook (D2) to Top Connection Pole(D1)
Fig.4:
Connect Top Connection Pole (D1) to Top Screen (A) by Bolt (AA) and Flat Washer (BB).
Fig.5:
Tighten Cover Supporting Bar (E) to the Tilt Beam (B1&B2) by Bolt (CC) and Flat Washer (BB)
UP
UP