Fig.13:Lock Small Roof
Inclined
Beam (L) and Big Roof Frame (J)
tightly by Bolt (CC) and Flat
Washer (BB). Dot lock tight.
Fig.14:Attach Small Roof Connector (M) to Small Roof Inclined Beam
(L) and lock them tightly by
Screw
(FF), Flat Washer (BB) and Nut
(GG). Screw Hook (R) on Small Roof Connector (M).
After complete this step, then fasten all bolts on Fig 13 & Fig 14.
Fig.15: Fix Small Roof
Baffe(K) as shown above.
Lock them tightly by Bolt
(CC) and Flat Washer
(BB).
Fig.16: Attach Small Roof
Inclined
Beam (L) to Small
Roof Baffe(K) and lock
them tightly by Bolt (CC)
and Flat Washer (BB).
Fig.17: Insert Arc Support Bar (C) to
the ecoration ring of Post (A), lock
them tightly by use Bolt (CC), Flat
Washer (BB). Then use Plastic
Cover(II) to cover the Bolt (CC).
Fig.18: Lock Netting and Curtain
Rods Connecting 1 (T1) and Arch
support (C) to Decoration Gutter (D)
by using Bolt (AA), Flat Washer
(BB). Then use Plastic Cover (II) to
cover the Bolt (AA).
Fig.19: Fix
Inner baffle (I),
Netting and Curtain Rods
Connecting 2&3 (T2&T3) and Decoration Gutter (D) together
by using Bolt (CC) and Flat Washer (BB). Then use Plastic
Cover (II) to cover the Bolt (CC).