Fig.8-1:
Attach Top slanting bar A3
and Top beam B3 to Big top frame A1
by using FF, BB.
(Do step fig8.1 and
fig8.2 at the same time, which is
needed 2 pieces of 2M ladder.)
Fig.8-2:
Attach Top slanting bar A3 to Slanting bar
connector F2, Top beam B3 to Beam connector G2 by
using CC, BB, DD. (Do step fig8.1 and fig8.2 at the
same time)
Fig.11:
Attach Big roof top beam X6 (X5/W5/W6
)
and Top slanting bar A3 by using AA, BB.
Fig.12:
Attach Big roof top beam X5
to Top beam B3 by using AA, BB.
(Repeat the procedure for X1-X6, W1-W6.)
Fig.13:
Attach Big roof top beam X4 to Top slanting bar A3 by using AA, BB
(Repeat the procedure for X1-X4, W1-W4.)
Fig.13-1:
Attach Long pipe L2a (L2b), Short pipe M2a (M2b) and Top beam B3 by using AA and BB.
Fig.13-2:
Attach Long pipe L2a (L2b), Short pipe M2a (M2b) and Top slanting bar A3 by using AA, BB.
Fig.9:
Fix Small top roof panel 1
F1 and Small top
roof panel 2 G1 onto Small top support beam C1 by
using AA, BB.
Fig.10:
Fix Small top cover H1 onto Small top support beam C1
by using EE, BB, then fix Small top roof cover I1 and Small top
connector D1 by using HH
,
BB.