6
GG
Ring
104 PCS
FF
¢
8*180 Stake
12 PCS
Fig.6:
Connect Sloped beam (D) and Sloped beam down pipe (F).
Fig.7:
Attach Sloped beams (D) to Big top connector (L) and then attach Hook (Q) to Big top connector (L).
Fig.8:
Connect Sloped beam down pipe (F) and Sloped beam down connector (G) with nuts (CC) and
washers (BB).
Fig.9:
Attach Middle beams (E1
、
E2) to Big top connector (L).
Fig.13
:
Attach the assembled Small canopy (S) by inserting the lower side tube of Small top
sloped beam (K) into the tube of Sloped beam (D).
Fig.14
:
Attach the lower end of Arch support 1 (I1) to Post (A) by using bolts (AA) and
washers (BB) and then attach the upper end of Arch support 1 (I1) to decorative slots.
Repeat step for Arch support 2 (I2)
Fig.10:
Insert the lower end of middle beams (E1
、
E2) into Middle beam down connectors (H1
、
H2). Then attach the big canopy but do not spread out.
Fig.11:
Attach Small top sloped beams (K) to Small top connector (M).
Fig.12:
Attach Small canopy (S) onto the small top and attach 4 corners to Small top sloped
beam (K), and then attach Finial (P) to the top.
Hardware Pack used in Step 3