Fig.14: Lift the Base protector (B4), attach the post base (A4) to the post (C4) with bolt (CC) & washer (BB).
Fig.15: Fix the top block (H4) to the post (C4) with bolt (CC) & washer (BB).
(Note: the screw holes on the post and the screw holes which install the block plate (E4) should be in the same
direction as shown on drawing.)
Fig.16: Lift the assembled pavilion roof and fix the assembled post to the corner of the roof with bolt (CC), bolt
(OO) &washer (BB).
(Note: The screw holes on the post must be directed inward. 6 people are needed here.)
Fig.17: Fix the Corner connector (N1) to the top block (H4) with bolt (CC) ,bolt (OO) & washer (BB).
Fig.18: Fix the arc support bar (F4/G4) to the post (C4) & decorative beam with bolt (CC),bolt (OO) &
washer (BB).
Fig.19: Fix the screen house on the grass ground with the peg (HH).
Fig.20: Fix the screen house on the cement ground with the anchor (II).