step 7 Slightly pull out the cable and then fasten the swivel nut. Lock the connector with the screw.

- - End

5.9

DRM Connection

In Australia and New Zealand, the inverter supports DRM0 as specified in the standard AS/

NZS 4777.

The DRM0 mode is asserted by shorting terminals

R

and

C

on the inverter.

step 1 Unscrew the swivel nut from the communication connector.

step 2 Remove the seal and lead the cable through the cable gland.

User Manual

5 Electrical Connection

Содержание SG2.0RS-S

Страница 1: ...S SG4 0RS SG5 0RS SG6 0RS1 Phase PV Grid Connected InverterUser ManualSG2 0 6 0RS UEN Ver18 202211 User Manual 1 Phase PV Grid Connected Inverter SG2 0RS S SG2 5RS S SG3 0RS S SG3 0RS SG3 6RS SG4 0RS...

Страница 2: ......

Страница 3: ...anual are owned by SUNGROW All other trademarks or registered trademarks mentioned in this manual are owned by their respective owners Software Licenses It is prohibited to use data contained in firmw...

Страница 4: ...parameters The inverter must only be installed by professional technicians The professional technician is required to meet the following requirements Know electronic electrical wiring and mechanical e...

Страница 5: ...ent way Please carefully understand the meaning of these warning symbols to better use the manual Indicates high risk potential hazards that if not avoided may lead to death or seri ous injury Indicat...

Страница 6: ......

Страница 7: ...Symbols on Product 10 2 4 LED Panel 11 2 5 Circuit Diagram 12 2 6 Function Description 13 3 Unpacking and Storage 17 3 1 Unpacking and Inspection 17 3 2 Inverter Storage 17 4 Mechanical Mounting 19 4...

Страница 8: ...5 6 3 Installing the PV Connectors 41 5 7 WiNet S Connection 42 5 7 1 Ethernet Communication 43 5 7 2 WLAN Communication 44 5 8 Smart Meter Connection 45 5 9 DRM Connection 47 6 Commissioning 50 6 1 I...

Страница 9: ...4 7 10 6 Auto test 85 8 System Decommissioning 87 8 1 Disconnecting Inverter 87 8 2 Dismantling the Inverter 87 8 3 Disposal of Inverter 88 9 Troubleshooting and Maintenance 89 9 1 Troubleshooting 89...

Страница 10: ......

Страница 11: ...bited under any circumstances Tighten the screws with the specified torque using tools when fastening the prod uct and terminals Otherwise the product may be damaged And the damage caused is not cover...

Страница 12: ...t install the device and contact your distributor first If the problem persists con tact SUNGROW in time 1 2 Installation Safety Make sure there is no electrical connection before installation Before...

Страница 13: ...all safety instructions listed in relevant documents about PV strings The inverter must not be connected to a PV string that requires positive or neg ative grounding Danger to life due to a high volta...

Страница 14: ...nd heat generating components or areas to protect the insulation layer of cables from aging and damage When the product is working Do not touch the product enclosure It is strictly forbidden to plug a...

Страница 15: ...intain the inverter Even if the inverter is shut down it may still be hot and cause burns Wear pro tective gloves before operating the inverter after it cools down Touching the power grid or the conta...

Страница 16: ...used is not covered by the warranty As the inverter contains no parts that can be maintained never open the enclo sure of the inverter or replace any internal components without authorization Otherwis...

Страница 17: ...wed for the positive pole or the negative pole of the PV strings to be grounded This can cause dam age to the inverter Do not connect any local load between the inverter and the AC circuit breaker The...

Страница 18: ...ows the common grid configurations 2 2 Product Introduction Model Description The model description is as follows take SG3 0RS S as an example Appearance The following figure shows the appearance of t...

Страница 19: ...ator indicates the working state of the inverter 4 Nameplate To clearly identify the product including device model S N important specifications marks of certification institutions etc 5 Electrical co...

Страница 20: ...planation Parameters on the DC side Parameters on the AC on grid side Regulatory compliance mark T V mark of conformity CE mark of conformity EU EEA Importer UKCA mark of conformity Do not dispose of...

Страница 21: ...e inverter figure 2 4 LED Panel a Normal state b Error state No Name Description 1 E day Today s energy yield 2 Pac Current AC power 3 LED indicator To indicate the working state of the inverter Touch...

Страница 22: ...operating 2 5 Circuit Diagram The following figure shows the main circuit of the inverter figure 2 5 Circuit Diagram SG6 0RS for example DC Switches can safely disconnect the PV input when necessary...

Страница 23: ...fatal injury 2 6 Function Description Basic Function Conversion function The inverter converts the DC power from the PV array to the AC power in conformity with the grid requirements Data storage The...

Страница 24: ...ation Set the feed in limitation value via iSolarCloud App When the smart energy meter detects that the export power is greater than the limit value the inverter will reduce the output power within th...

Страница 25: ...and re pairs PV panels caused by PID at night Details can be found in the PID Zero White Paper which can be obtained on www sungrowpower com or from your distributor figure 2 7 PID Risk of Inverters E...

Страница 26: ...ween PV and ground needs to be raised for PID recovery AFCI Function Optional AFCI activation This function can be enabled to detect whether arc occurs in the DC circuit of the inverter AFCI self test...

Страница 27: ...appearance and structural parts of the device are damaged and check whether the packing list is consistent with the actual ordered product If there are problems with the above inspection items do not...

Страница 28: ...ceptible to rodents and insects Carry out periodic inspections Inspection shall be conducted at least once every six months If any insect or rodent bites are found replace the packaging materials in t...

Страница 29: ...andling may cause personal injury When moving the inverter be aware of its weight and keep the balance to pre vent it from tilting or falling Wear proper protective equipment before performing operati...

Страница 30: ...re and relative humidity must meet the following requirements Install the inverter in a sheltered area to avoid direct sunlight and bad weather e g snow rain lightning etc The inverter will derate in...

Страница 31: ...lly Never install the inverter horizontally or at forward backward tilted side tilted or upside down 4 2 4 Clearance Requirements Reserve enough clearance around the inverter to ensure sufficient spac...

Страница 32: ...Installation tools include but are not limited to the following recommended ones If necessary use other auxiliary tools on site table 4 1 Tool specification Goggles Earplugs Dust mask Protective glove...

Страница 33: ...Hammer drill 10 4 4 Moving the Inverter Before installation remove the inverter from the packing case and move it to the installation site Follow the instructions below as you move the inverter Alway...

Страница 34: ...ld be placed underneath the inverter Move the inverter by holding the handles on it Do not move the inverter by holding the terminals 4 5 Installing the Inverter Inverter is installed on the wall by m...

Страница 35: ...6RS SG4 0RS SG5 0RS SG6 0RS 347 312 40 step 2 Place the expansion tubes into the holes Then secure the wall mounting bracket to the wall firmly with the expansion bolt sets step 3 Lift the inverter a...

Страница 36: ...26 End 4 Mechanical Mounting User Manual...

Страница 37: ...l the electrical connection is completed Do not damage the ground conductor Do not operate the product in the absence of a properly installed ground conductor Otherwise it may cause personal injury or...

Страница 38: ...inal closely When using a heat gun protect the device from being scorched Keep the PV cable and PV cable close to each other when connecting DC in put cables Before connecting a power cable such as th...

Страница 39: ...table 5 1 Terminal Description No Name Description Decisive Volt age Classification 1 PV1 PV1 PV2 PV2 MC4 terminals for PV input The terminal number depends on in verter model DVC C 2 COM1 Communicat...

Страница 40: ...e smart energy meter DRM R C For external Demand Response Enabling Device AU NZ RSD RSD 1 RSD 2 Reserved 5 3 Electrical Connection Overview The electrical connection should be realized as follows A PV...

Страница 41: ...out the wiring color It is recommended to use heavy duty conduits when run cables through Cavity walls or lay out cables with corresponding conduits For AU and NZ 5 4 External Protective Grounding Con...

Страница 42: ...njury The grounding connection can be made by other means if they are in accordance with the local standards and regulations and SUNGROW shall not be held liable for the possible consequences 5 4 1 Ex...

Страница 43: ...he wires must contact the OT terminal closely When using a heat gun protect the device from being scorched step 2 Remove the screw on the grounding terminal and fasten the cable with a screwdriver ste...

Страница 44: ...inations has not been conducted AC circuit breakers should be installed on the output side of the inverter and the grid side to ensure safe disconnection from the grid Determine whether an AC circuit...

Страница 45: ...n run PV and AC cables through Cavity walls Route the PV and AC cables through pipes PVC or metal tubing lay the cables and in stall them 5 5 2 Assembling the AC Connector step 1 Unscrew the swivel nu...

Страница 46: ...rve the plug assignment Do not connect the L line to the PE terminal or the PE wire to the N terminal Otherwise unrecoverable damage to the inverter may follow Do not connect the L line and the N line...

Страница 47: ...o the GRID terminal on the bot tom side of the inverter Then press the locking part and lock it with the screw step 3 Connect the PE wire to ground and the phase lines and the N line to AC circuit bre...

Страница 48: ...e the inver ter may be damaged Please turn the DC switch to OFF and remove the DC connector to adjust the polarity of the strings when the string current is lower than 0 5 A Use the DC connectors supp...

Страница 49: ...radius is greater than 50 mm reserve the required mini mum bending radius during wiring 5 6 1 PV Input Configuration The inverters SG2 0RS S SG2 5RS S SG3 0RS S have one PV input with one MPP tracker...

Страница 50: ...electrical connection To ensure IP65 protection use only the supplied connector step 1 Strip the insulation from each DC cable by 7 mm 8 mm step 2 Assemble the cable ends with the crimping pliers 1 Po...

Страница 51: ...will not operate normally End 5 6 3 Installing the PV Connectors step 1 Rotate the DC switch to OFF position step 2 Check the cable connection of the PV string for polarity correctness and ensure that...

Страница 52: ...optimizer manual for electrical connections and make sure that the polarity of the optimizer cables is correct End 5 7 WiNet S Connection The WiNet S module supports Ethernet communication and WLAN co...

Страница 53: ...with a crimper 1 RJ45 plug 2 Protective cap Skip this step if a standard network cable with RJ45 plug is prepared step 2 Unscrew the swivel nut from the communication module and take out the inner sea...

Страница 54: ...ve the waterproof lid from the COM1 terminal and install WiNet S step 7 Slightly shake it by hand to determine whether it is installed firmly End 5 7 2 WLAN Communication step 1 Remove the waterproof...

Страница 55: ...ill require the use of a external smart meter The export control functionality has not been tested to AS NZS 4777 2 2020 step 1 Unscrew the swivel nut from the communication connector step 2 Remove th...

Страница 56: ...copper wire skip this step step 5 Plug the wires into the corresponding terminals as shown in the following figure Ensure that the wires are securely in place by slightly pulling them step 6 Insert th...

Страница 57: ...ustralia and New Zealand the inverter supports DRM0 as specified in the standard AS NZS 4777 The DRM0 mode is asserted by shorting terminals R and C on the inverter step 1 Unscrew the swivel nut from...

Страница 58: ...strand wire cable connect the wire head to the cord end terminal In case of single strand copper wire skip this step step 5 Plug the wires into the corresponding terminals as shown in the following fi...

Страница 59: ...lug into the COM2 terminal at the bottom side of the inverter and then in stall the housing step 7 Slightly pull out the cable and then fasten the swivel nut Lock the connector with the screw End User...

Страница 60: ...ards All warning signs labels are intact and legible 6 2 Powering on the System If all of the items mentioned above meet the requirements proceed as follows to start up the inverter for the first time...

Страница 61: ...ssword for logging in to iSolarCloud App have been obtained from the distributor installer or SUNGROW The communication device is normally connected to the inverter System positioning is enabled and i...

Страница 62: ...rface figure 6 2 Plant Creation Settings Parameter Name Description Plant name The name of the plant Plant type The type of the plant which should be set corresponding to the actual plant type Install...

Страница 63: ...place where the plant is located Plant image Take photos of the plant and upload them Feed in tariff The feed in tariff can be set in two ways Enter the feed in tariff directly in the input box Tap Mo...

Страница 64: ...Device and Commissioning to go to corresponding interface step 7 Tap Network Configuration to go to the WLAN connection interface Tap the home net work in the WLAN list enter the password and then ta...

Страница 65: ...ly returns to the commissioning interface after the processing is completed Only the 2 4 GHz working band is supported under the networking mode If the Easyconnect fails please refer to other methods...

Страница 66: ...stralia additionally set the applicable network service provider and then the grid type The image shown here is for reference only Refer to the actual interface for the supported network service provi...

Страница 67: ...ee phase 30 kVA three phase United Energy UE ST 2008 1 10 kVA for single phase 30 kVA for three phase UE ST 2008 2 30 kVA three phase PowerWater Embedded Generation Notice Photovoltaic Systems 2020 SA...

Страница 68: ...router If there is no latest equipment upgrade package skip steps 1 and 2 The actual initializing procedure may differ due to different countries Please follow the ac tual App guidance step 1 If a la...

Страница 69: ...y Region Setting Belgium BE Belgium Netherlands NL Netherlands Portugal Turkey Hungary Romania Greece Lithuania EN50549 1 with proper manual settings Poland PL Poland United Kingdom United Kingdom Uni...

Страница 70: ...e 6 2 Description of Network Service Provider and Grid Type Network Service Provider Grid Type AS NZS 4777 2 2015 AS NZS 4777 2 2020 Australia A AS NZS 4777 2 2020 Australia B AS NZS 4777 2 2020 Austr...

Страница 71: ...200 kW Horizon Power HPC 9DJ 13 0001 2019 10kVA for single phase 30 kVA for three phase HPC 9DJ 13 0002 2019 30kVA 1MVA westernpower EDM 33612889 2019 AusNet Services Basic Micro Embedded Generation 2...

Страница 72: ...e mail address is required and each e mail address can be registered only once step 1 The App screen will display the added inverter Tap NEXT to configure the plant figure 6 6 Display the Added Inver...

Страница 73: ...will create an account for the end user and send an email to the end user The end user can activate the account via the email The Distributor installer creates plants for the end user and can manage t...

Страница 74: ...Tab the inverter to view the live data about voltage current power or curve figure 6 11 Live Data View Function Setting Contact Sungrow service to enable live data function of devices Once enabled li...

Страница 75: ...65 step 8 Tab BACK to the COMPLETED screen Tab DASHBOARD to return and manually refresh the page until the newly created plant is displayed with status commissioned End User Manual 6 Commissioning...

Страница 76: ...blish communi cation connection to the inverter via Ethernet connection This manual describes only how to achieve near end maintenance via WLAN direct connection Screenshots in this manual are based o...

Страница 77: ...ters share plants etc The distributor installer can help the end user to create plants manage install or main tain plants and manage users and organizations step 1 Tap REGISTER to enter the registrati...

Страница 78: ...ller organization can you fill in the corresponding code step 5 Tick Accept privacy protocol and tap Register to finish the registration operation End 7 4 Login 7 4 1 Requirements The following requir...

Страница 79: ...inverter related data information cannot be found unplug and reinsert the Winet S or press the multi function button of the Winet S three times The default account is user and the initial password is...

Страница 80: ...ll send start instructions and the device will start and operate step 7 After initialization settings the App will return automatically to the home page End 7 5 Initial Settings Tap Country Region and...

Страница 81: ...me countries you should initialize parameters according to local grid re quirements For details please refer to the relevant technical documents on http support sungrowpower com 7 6 Function Overview...

Страница 82: ...72 figure 7 4 App Function Tree Map 7 7 Home Home page of the App is shown in the following figure 7 iSolarCloud App User Manual...

Страница 83: ...ws the installed power of the inverter 5 Today yield Shows today power generation of the inverter 6 Total yield Shows accumulative power generation of the inverter 7 Navigation bar Includes menus of H...

Страница 84: ...age and current of MPPT1 and MPPT2 Output Shows daily monthly annual total yield total active reactive appa rent power total power factor grid frequency phase voltage and current Grid information Show...

Страница 85: ...n of Power Curve Item Description Daily Daily curve that indicates the real time power Month Monthly curve that indicates daily yield and equivalent hours in a month Year Annual curve that indicates m...

Страница 86: ...records Select one of the records in the list and click the record to view the detailed fault info as shown in following figure figure 7 9 Detailed Fault Alarm Information Event Record Tap Event Reco...

Страница 87: ...een as shown in the following figure figure 7 11 More In addition to viewing the WLAN configuration and App software version the More screen supports the following operations Set parameters including...

Страница 88: ...e Setting The correct system time is very important Wrong system time will directly affect the data logging and power generation value The clock is in 24 hour format Software Version Version informati...

Страница 89: ...n connected to the grid Full Day PID Suppression The function is turned on and the PID is adjusted throughout the day AFCI Parameters Optional Tap Settings Operation Parameters AFCI Parameters to ente...

Страница 90: ...wer gradient control On Off Active Power Decline Gradient Decline gradient of inverter active power per minute 1 min 6000 min Active Power Rising Gradient Rising gradient of inverter active power per...

Страница 91: ...ctor PF is fixed and the reactive power is regulated by the parameter PF The PF ranges from 0 8 leading to 0 8 lagging Leading the inverter is sourcing reactive power to the grid Lagging the inverter...

Страница 92: ...de curve Curve A C 0 800 to 1 000 Curve B 0 600 to 0 600 QP_K2 Power factor at point P2 on the Q P mode curve QP_K3 Power factor at point P3 on the Q P mode curve QP_ EnterVoltage Voltage for Q P func...

Страница 93: ...0 0 QU_V4 Grid voltage limit at point P4 on the Q U mode curve in 100 0 120 0 QU_Q1 Value of Q Sn at point P1 on the Q U mode curve in 60 0 to 0 0 QU_Q2 Value of Q Sn at point P2 on the Q U mode curve...

Страница 94: ...d to download the firmware package to the mobile device in advance step 1 Enable the Mobile data of the mobile device step 2 Open the App enter the account and password on the login screen Tap Login t...

Страница 95: ...p CONFIRM to perform the firmware upgrade step 9 Wait for the file to be uploaded When the upgrade is finished the interface will inform you of the upgrade completion Tap Complete to end the upgrade E...

Страница 96: ...86 figure 7 22 Auto test Result Clear Auto test Fault Tap Clear Auto test Fault CONFIRM to clear the auto test fault figure 7 23 Clear Auto test Fault 7 iSolarCloud App User Manual...

Страница 97: ...completely discharge step 4 Ensure that the DC cable is current free with a current clamp End 8 2 Dismantling the Inverter Risk of burn injuries and electric shock After the inverter is powered off f...

Страница 98: ...e wall step 4 If the inverter will be used again in the future please refer to 3 2 Inverter Storage for a proper conservation End 8 3 Disposal of Inverter Users take the responsibility for the disposa...

Страница 99: ...tage and contact the local electric power company for solutions if the grid voltage is higher than the set value 2 Check whether the protection parameters are appropriately set via the App or the LCD...

Страница 100: ...ted to the correct terminal whether the live wire and the N wire are correctly in place 4 Check whether the AC circuit breaker is connected 5 Contact Sungrow Customer Service if the pre ceding causes...

Страница 101: ...s of reverse polarity If so disconnect the DC switch and adjust the polarity when the string current drops below 0 5 A 2 Contact Sungrow Customer Service if the pre ceding causes are ruled out and the...

Страница 102: ...to code 595 are corresponding to string 17 to string 32 respectively 37 Excessively High Ambient Temperature Generally the inverter will resume operation when the internal or module temperature return...

Страница 103: ...als to ensure a reli able connection 5 Contact Sungrow Customer Service if the pre ceding causes are ruled out and the fault persists 106 Grounding Cable Fault 1 Check whether the AC cable is correctl...

Страница 104: ...ication cable of the meter 3 Contact Sungrow Customer Service if the pre ceding causes are ruled out and the alarm persists 323 Grid Confrontation 1 Check whether the output port is connected to actua...

Страница 105: ...233 432 434 500 513 515 518 635 638 900 901 910 911 996 System Alarm 1 The inverter can continue running 2 Check whether the related wiring and terminal are abnormal check whether there are any for ei...

Страница 106: ...e bat teries Close the AC and DC switches in turn 15 minutes later and restart the system 2 If the fault persists please contact Sungrow Power Customer Service 1548 1579 String Current Reflux 1 Check...

Страница 107: ...ustomer Service 1616 System Hardware Fault 1 It is prohibited to disconnect the DC switch when the DC current is greater than 0 5 A when the fault occurs 2 Disconnect the DC switch only when the inver...

Страница 108: ...f there is no odor smoke or obvious abnormal appearance repair or restart the inverter according to the alarm corrective measures Avoid standing directly in front of the inverter during maintenance To...

Страница 109: ...firmly con nected in place Check whether there is damage to the cables especially the surface in con tact with metal 6 months after commissioning and then once or twice a year General status of the sy...

Страница 110: ...ax DC short circuit current 20 A Output AC Rated AC output power 2000 W 2500 W 3000 W Max AC output apparent power 2000 VA 2500 VA 3000 VA Rated AC output apparent power 2000 VA Rated AC output curren...

Страница 111: ...ht 6 kg Mounting method Wall mounting bracket Topology Transformerless Degree of protection IP65 Operating ambient temper ature range 25 to 60 Allowable relative humidity range non condensing 0 100 Ma...

Страница 112: ...W 2 4000 W Max AC output apparent power 3000 VA 3680 VA 3 4000 VA Rated AC output apparent power 3000 VA Rated AC output current at 230 V 13 1 A 16 A 17 4 A Max AC output current 13 7 A 16 A 18 2 A Ra...

Страница 113: ...ambient temper ature range 25 to 60 Allowable relative humidity range non condensing 0 100 Max operating altitude 4000 m Cooling method Natural cooling Display LED digital display LED indicator Commu...

Страница 114: ...U 5000 VA for others 6000 VA Max AC output apparent power 4999 VA for AU 5000 VA for others Rated AC output current at 230 V 21 7 A for AU 21 8 A for others 26 1 A Max AC output current 21 7 A for AU...

Страница 115: ...l display LED indicator Communication Ethernet WLAN RS485 DI Ripple control DRM DC connection type MC4 Max 6 mm2 MC4 Compatible Connector Max 6 mm2 AC connection type Plug and play connector Max 6 mm2...

Страница 116: ...formed by a service provider or personnel not from SUNGROW The fault or damage is caused by the use of non standard or non SUNGROW compo nents or software The installation and use range are beyond st...

Страница 117: ...www sungrowpower com Sungrow Power Supply Co Ltd...

Отзывы: