System Manual
5 Mechanical Installation
21
>
60
°
L
Fig. 5-2
Hoisting from top fittings
Item
Requirement
Steel Length(L)
>
6.5 m
Steel Rope Qty.
4 pieces
5.2.3 Fastening of Connectors
Use slings with hooks or U-hooks to hoist the MV Station.
The lifting devices should be correctly connected to the MV Station.