5 of 12
REAR VIEW
FRONT VIEW
A
PerPendICular MounTIng
(Cases 1 & 2)
Structural rails running perpendicular
to the length of the module should be
fixed via bolts or clamps at the mounting
holes between each long side frame, OR
at the holes on each short end frame.
Parallel MounTIng (Case 3)
Structural rails running parallel to the
length of the module should be fixed
ONLY via bolts at the mounting holes or
clamps within the allowable clamp range
on each long side frame.
Maximum
Rear Load:
2400 Pa or 50 psf
Maximum
Front Load:
5400 Pa or 113 psf
Maximum
Rear Load:
2400 Pa or 50 psf
Maximum
Front Load:
5400 Pa or 113 psf
Maximum
Rear Load:
2400 Pa or 50 psf
Maximum
Front Load:
5400 Pa or 113 psf
REAR VIEW
FRONT VIEW
A
REAR VIEW
FRONT VIEW
B
bolT MounT
loCaTIons
ClaMP MounT
loCaTIons
MounTIng ConfIguraTIons
load ParaMeTers
Case
1
Case
2
Case
3
Module Color Code: Mounting Hole Location
Module Rail
Clamp Mount Range
Clamp mount
allowable
range
Clamp mount
allowable range
A:0 – 382 mm
B:0 – 248 mm
Clamp mount allowable range:
Clamp mount
allowable range
Installation Manual: sunedison silvantis 60 Cell Pv Modules
© Copyright 2013 SunEdison, Inc.
Table 4.2a