67. Nail the sheeting on the bottom side first.
68. Move the 2x4 rafters to line up perfectly with
the roof sheeting.
69. Move the rafters so that the marks made
in step 110 are directly over the center of
each rafter; nail every 8” on each rafter.
72. Locate the pictured parts; these will go
inside the end walls.
70. Attach the remaining piece of roof
sheeting. There will be a small gap between the
two top pieces of the roof sheeting on both sides.
71. Nail the siding on the front and on the back
into the rafter.