Control
Flag Tag
Label
Power Cord
Module
Left Side
Right Side
Control Cord
Connector
Left (Secondary)
Control
Flag Tag
Label
Power Cord
Module
Left Side
Right Side
Right
(Primary) Control
(Label on back
of control)
Control Cord
Connector
E7
For questions or support, please visit www.sunbeambedding.com.
1 Place the heated blanket/mattress pad on the bed with the label at the foot of the bed facing upward.
2 Connect the cord into the module at the bottom of the heated blanket/ mattress pad until the plastic
hinges click into place.
CAUTION:
Cord must be COMPLETELY CONNECTED. A risk of fire could result from a loose connection.
3 Run the control cord on the floor under the bed. Do not sandwich cord between the mattress and box
spring. Avoid any tangling or pinching.
4 Plug power cord into a 110-120 volt wall outlet.
CAUTION:
Do not use with generator power or inverter.
Control Placement:
• Dual Control for heated blanket or mattress pad
– place primary control (label on back of
control) on the right side of the bed.
Heated Blanket, Mattress Pad and
Comforter Setup
See Control Features on page 8
for your individual control.
If there is a flashing light or your control displays
a flashing “F” , “F1” or “F2” see page 13.
• Single Control for heated blanket or mattress pad
–
the control can be placed on either side of the bed.
STEP
1
Place on bed with
label at foot of bed
facing out
STEP
2
Connect the Control
Cord connector and
module securely
STEP
3
Run Control Cord
under the bed
STEP
4
Plug Power Cord
into wall
STEP
1
Place on bed with
label at foot of bed
facing out
STEP
2
Connect the Control
Cord connector and
module securely
STEP
3
Run Control Cord
under the bed
STEP
4
Plug Power Cord
into wall
Sunbeam HeatedBedding IB_17ESM1.indd 7
2/3/17 09:09