![Sunamp UniQ HW +iLTHP Series Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/sunamp/uniq-hw-ilthp-series/uniq-hw-ilthp-series_installation-and-user-manual_1393340036.webp)
36
11.
After 30 minutes open the hot water tap and check for hot water.
12.
Adjust the Thermostatic Mixing Valve (TMV) so that the output
temperature is
45°C to 55°C
.
13.
Check hot water temperature at all hot water outlets in the dwelling with
the customer and advise on temperature settings.
14.
Ensure that the Heat Battery charges to half charge and that there are
no lights flashing (which may otherwise indicate an error, see table 13,
below).
15.
Leave all product information and literature with the customer / end
user.
16.
Fill in and return the Sunamp Ltd. commissioning certificate, provided
with the product.
These documents MUST be compiled and returned
to Sunamp after installation.