
4
Sun StorEdge A1000 and D1000 Tower Mount Installation • June 1998
FIGURE 3
Tower Stand Underside
b. Press in on the plastic clips until you can move the end pieces apart.
3. Place the tower stands upright as far apart as the remaining two feet.
4. Set the system on its side in the stand.
The LEDs on the system should be at the top. The tower stand end pieces should
cover the remaining two feet. See
.
5. Slide the two halves of the stand together to fit tightly against the system.
See
Clip
Lock notches
Clip
Footpad
Footpad