background image

           

F i b e r   O p t i c   S o l u t i o n s   P r o v i d e r

 

                           

15/54 

 

 

www.suntelecom.cn • +86-21-60138638 • [email protected]

 

Press “OK” to exit this install interface. However the driver still haven’t install 

yet, continue the following operation:   

Use  USB  cable  connect  with  power  meter  and  the  PC,  switch  on  the 

instrument, and pop up 5-3 

 

5-3 

Press “NEXT”, Pop up 5-4. 

Содержание SUN-OPM200 Series

Страница 1: ...SUN OPM200 Series Fiber Optic Power Meter Table SUN UM TE OPM004 Version A 0 All the trademarks mentioned in this manual are registered property of Sun Telecom The right to interpret this manual is re...

Страница 2: ......

Страница 3: ...peration of the damage Notice notice the important information notification and references these notice information should be understood Safety sign on the instrument WEEE Sign Users of electrical and...

Страница 4: ...uch 3 To prevent electric shock do not open the product case only the authorized qualified professionals can do the maintenance Do not expose the testers to rain or wet conditions to avoid the risk of...

Страница 5: ...cs suntelecom cn Contents Chapter 1 Standard configuration 1 Chapter 2 Overview 1 Chapter 3 Specifications 2 Chapter 4 Function 3 Chapter 5 OPM Software 14 Chapter 6 Operation Instruction and Notes 31...

Страница 6: ...cceptance and maintenance of fiber network Compared with other usual power meters this power meter has more functions when used with SUN LS200 Series handheld optical light source like automatic wavel...

Страница 7: ...2K Wave ID nm 850 1300 1310 1490 1550 1625 Date Storage Capacity 1000 Communication Port USB Standard Connector FC 2 5mm universal Optional Optical Connector FC SC ST Interchangeable 2 5mm universal O...

Страница 8: ...g setting the unit will automatically shut off after 15 minutes idle time whatever in the condition of battery power supply or AC power supply Once choose this setting the auto off will display on the...

Страница 9: ...t of the LCD screen 1310nm is the default wavelength Press the for 2 seconds enter into wavelength auto identify on the upper right of screen have AU and also long press this key to quit this function...

Страница 10: ...e back light control key mode Press to on off the back light 4 Saving Data view Key Data saving can save data records no more than 1000 Press screen will display the Data saving No tip saving the data...

Страница 11: ...Cancel Key 1 Data Deletion When view the data press to delete the record 2 Cancel the saving When in the saving mode press to cancel the current data saving 6 Unit Switch Key Press this key to switch...

Страница 12: ...the current power value as the reference value which will be displayed on the top right of the LCD screen at the same time the Ref also display on the right top It will compare the current power with...

Страница 13: ...backlight control mode Red light indicate that key control mode 9 LDR Intelligent Backlight Controller In the intelligent backlight control mode the controller will automatically adjust the backlight...

Страница 14: ...m cn 86 21 60138638 ics suntelecom cn 4 4 Notice Please only use the power supply unit supplied with the tester use other kind of PSU may cause damage to the instruments 2 USB Port Use the USB cable s...

Страница 15: ...protect the optical connector avoid damage on the connector as a result of that when the tester not in use please make sure that you place the dust cap over the connectors 2 Optical Connector The sta...

Страница 16: ...sal connector can connect with FC SC and ST adaptor Pic 4 9 4 9 Notice the tinny dust on the connector will affect the accurate of the measurement value so please clean the connector and the patch cor...

Страница 17: ...i o n s P r o v i d e r 12 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 4 10 4 4 Backside 4 11 1 Label Content include the function and the instrument information 2 Bracket Collapsible metal...

Страница 18: ...om cn 3 Battery Pack 3 pieces of 1 5V AA batteries Notice When insert the batteries take a note of their positive and negative connector orientation The negative battery connector should be against th...

Страница 19: ...elecom cn 86 21 60138638 ics suntelecom cn Chapter 5 OPM Software 5 1Install the device Run the software in the PC find the Driver exe as show in the below Double click that exe program the following...

Страница 20: ...om cn 86 21 60138638 ics suntelecom cn Press OK to exit this install interface However the driver still haven t install yet continue the following operation Use USB cable connect with power meter and...

Страница 21: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 16 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 4 Wait for a second pop up 5 5...

Страница 22: ...munication problem when power meter connect with the PC Open the Device Manager right click My computer choose property pop up the property interface choose hardware option click Device Manager find t...

Страница 23: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 18 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 6...

Страница 24: ...54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 7 After success install the devices can switch off the power meter and disconnect the USB 5 2 Install the application software Run the CD in the...

Страница 25: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 20 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 8 Press Next and pop up 5 9...

Страница 26: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 21 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 9 Choose I accept Click Next pop up 5 10...

Страница 27: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 22 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 10 Choose I accept click Next pop up 5 11...

Страница 28: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 23 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 11 Click Next pop up5 12...

Страница 29: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 24 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 12 Wait for a seconds Pop up 5 13...

Страница 30: ...installation 5 3 Software function instruction This software has two functions data processing and the instrument setting After finish the software find the short cuts icon for this software Double c...

Страница 31: ...54 www suntelecom cn 86 21 60138638 ics suntelecom cn 5 3 1 Data Processing 5 14 Data Processing interface include 4 parts 1 Manual a Port Option Drop down the option box choose the right port which...

Страница 32: ...own the selection Find the right language for the user preference Chinese English d Function interface option Two functions for option data processing and the instrument setting drop down the manual t...

Страница 33: ...ormation form Fill the information in blank 3 Printing button to print the measurement value 4 Data process button a Upload the data to the PC display the data on PC for the user view b Delete the cho...

Страница 34: ...www suntelecom cn 86 21 60138638 ics suntelecom cn 5 3 2 Power Meter setting 5 15 The Power Meter setting interface pic 5 3 2 which include 4 parts 1 Manu bar Please refer description in data process...

Страница 35: ...p t i c S o l u t i o n s P r o v i d e r 30 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 3 Time Setting 4 Recover the factory default setting Power meter calibration recovers the factory def...

Страница 36: ...owered or AC adaptor powered giving total flexibility for most testing sites and situations 6 1 1 AA battery When use AA battery the power meter will display the battery capacity on the left top of th...

Страница 37: ...onnector should be against the spring Insert 3 new 1 5VV AA batteries Refit the battery compartment cover The clip fastener should click shut Notice Make sure that you insert the batteries with their...

Страница 38: ...e the AC adaptor connect the power plug as pic 6 4 and insert to the AC socket 6 4 Notice Please only use the power supply unit supplied with the tester use other kind of PSU may cause damage for the...

Страница 39: ...If auto off function chosen the Auto off will display on the left bottom of the screen 6 3 Backlight setting After turn on the optical power meter long press to select backlight control mode 6 3 1 LDR...

Страница 40: ...utput power measurement 6 4 1 Take off the dust cap connect with the patch cord Notice Make sure the connector and the end face of the patch cord is clean and take notice on the type of the patch cord...

Страница 41: ...6 4 3 Unit Switch Press to switch between the absolute measurement dBm and relative measurement dB and xW of the optical power 6 9 6 9 6 4 4 Relative value measurement Each wavelength can set the Ref...

Страница 42: ...ta records saving memory When do the output power measurement press at the right top of the screen will display the data saving No e g 0008 6 11 hint that if the data save or not double press confirm...

Страница 43: ...Communication Note Before proceed the data communication make sure the driver and application software are installed successfully Details of installation please refer to chapter 5 6 5 1 Open the soft...

Страница 44: ...r o v i d e r 39 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 6 13 Connect Optical power meter with computer via USB cable turns on the power meter From the Device Manager Port COM LTP we ca...

Страница 45: ...138638 ics suntelecom cn 6 14 Therefore choose COM4 port shown as below figure 6 15 6 15 Next click Connect as shown in below figure 6 16 will pop up a successful connection window shown as 6 17 click...

Страница 46: ...ww suntelecom cn 86 21 60138638 ics suntelecom cn 6 17 6 5 2 Data edit Firstly input the following basic information as shown on figure 6 18 6 18 Then click Upload data the saved data in the unit will...

Страница 47: ...untelecom cn 6 19 Data edit at data display area including data delete data save and data printing Select the required data click delete one to delete it from the sheet as shown on figure 6 20 and fig...

Страница 48: ...F i b e r O p t i c S o l u t i o n s P r o v i d e r 43 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 6 20...

Страница 49: ...o l u t i o n s P r o v i d e r 44 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 6 21 Click Delete all pop up a window shown as figure 6 22 click OK to delete all data also will clear all sav...

Страница 50: ...ntelecom cn 86 21 60138638 ics suntelecom cn 6 22 Click Save pop up a window shown as figure 6 23 input the file name choose the save path and press ok for storage File will be with EXCEL format and w...

Страница 51: ...86 21 60138638 ics suntelecom cn 6 24 Click on the software you can print testing report directly you can also print the testing report from Excel 6 5 3 Function setting of the unit Under function set...

Страница 52: ...47 54 www suntelecom cn 86 21 60138638 ics suntelecom cn 6 26 There are there items can be set on the unit 1 Optical Power Calibration 6 27 Input the corresponding optical power and click calibration...

Страница 53: ...e and then click Set to modify the time and date accordingly 3 Back to factory mode 6 29 Click Reset the unit will be back to default setting factory mode setting 6 5 4 Close software Click exit pop u...

Страница 54: ...D operation mode Hold down for few seconds power meter will be enter into Wave ID mode also AU will be shown on the upper right of LCD for an indication Once the ID information is changed from light s...

Страница 55: ...be unstable when the power is weak How to act tone detection on Power Meter Connect power meter with its same serials light source SUN LS200 Output frequency from MATCHED optical light source Press to...

Страница 56: ...h alkaline batteries or is with power supply adaptor directly Manual power off Under any operation mode hold down for a few seconds to turn the unit off Note With either power off operation the unit w...

Страница 57: ...Details of warranty terms and conditions are given as below 1 Sun Telecom warrants that Optical Power Meter will be free from defects in material and workmanship for a period of 18 months The date wi...

Страница 58: ...iod Failures and damages occurred do not because of defects in material and workmanship of products Failures and damages occurred because of failing to comply with the Operation Instruction and necess...

Страница 59: ...in confidential By returning this card you will automatically be notified about updates modifications and recalibration Warranty Registration Card Serial Number Model Number Date of Purchase Company N...

Страница 60: ...TELECOMMUNICATION CO LTD Building No 145 Lane 666 Xianing Rd Jinshan Industrial Zone Jinshan District ShangHai China 201506 Tel 86 21 60138638 Fax 86 21 60138635 401 E mail ics suntelecom cn http www...

Отзывы: