12
Sun StorEdge T3 and T3+ Array Telco Rack Installation Guide
• August 2001
FIGURE 9
Alternate rack configuration: attaching side rails to a 2-post 5” and 6” rack.
Note –
Brackets are optional only for 2-post 3” and 6” rack configurations.
Installing the Array in the Rack
Caution –
The rack can become front-heavy while a array is being installed. Unless
your rack is bolted to the floor, ensure that the stabilizer legs are extended before
proceeding. Failure to extend the legs can result in the rack tipping forward and
injuring personnel.
Caution –
This installation requires two people to lift and move the array. Use care
to avoid injury. A array with a support plate attached can weigh up to
87 pounds (39 kg).
1. With the aid of an assistant, lift the array (one person on each side) and approach
the rack with the back of the array entering the front of the rack.