Sun StorEdge™ L25 Tape Library and Sun StorEdge™ L100 Tape Library Installation Guide
Document 6423015-01, Ver. 1, Rel. 0
June 2002
Installing a Rack Mount Library
13
4
Install the front shelf clamps (see
):
a
Position a front shelf clamp (PN 217397) on the front left rack
rail.
b
Secure the shelf clamp to the rack rail using two countersink
screws (PN YS40986).
c
Repeat these steps to install a shelf clamp on the front right
rack rail.
Figure 7 Installing the
Front Shelf Clamps
5
Fully tighten the screws securing the right and left shelves to the
rack rails.
6
Install the clamp strips (see
):
a
Position a front shelf clamp (PN 217397) at the front of the front
left rack rail, with the bottom of the clamp approximately 9U
above the bottom of the rack mount shelf.
Caution:
The top of the front shelf clamp must be no more
than 22.75 in. (580 mm) above the bottom of the rack
mount shelf.
Front
shelf clamp