![Sun Microsystems 5500 Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/sun-microsystems/5500/5500_installation-manual_1392443056.webp)
3-10
Sun Enterprise 6500/5500/4500 Systems Installation Guide • August 2001
FIGURE 3-5
Key Switch on the Enterprise 4500
4. Turn the AC power switch (
FIGURE 3-6
) to On.
5. Turn the key switch (
FIGURE 3-5
) to the On position.
You should see and hear several things happen:
■
The fans in the power supplies begin turning.
■
The top front panel LED (green) turns on immediately denoting the power
supply is delivering DC power.
■
The middle front panel LED (yellow) flashes while POST runs for
approximately 60 seconds. After 60 seconds, this LED turns off if the tests pass.
If the LED remains lighted after 60 seconds, a test has failed.
■
The bottom front panel LED (green) flashes to show that booting is successful
and the operating system is running. If this LED fails to turn on and the
middle LED is on, a severe hardware fault exists.
TABLE 3-3
Key Switch Positions
Position
Function
Standby
Off, no DC power
On
Normal power on
Diagnostics
Normal power on, with full diagnostics
1
1. Full power on self-test verbose.
Locked
Normal power on, in secure mode
Standby
On
Diagnostics
Locked
Front view
Содержание 5500
Страница 6: ...vi Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Страница 10: ...x Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Страница 16: ...xvi Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Страница 46: ...2 14 Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Страница 76: ...Index 4 Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...