Sun-Mar CENTREX 3000 series Скачать руководство пользователя страница 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                

 

 

                                                           
                                                                         

   

 

       

      

    

 

                                                                         

 

       

 

    

 

                                                            

 

 

Models for which the manual applies

CCEB-02510 Centrex 3000 115V 
CCNB-02540 Centrex 3000 NE 
CCEB-02515 Centrex 3000 230V

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Содержание CENTREX 3000 series

Страница 1: ...ACITY Residential Continuous Use Certified to NSF ANSI Standard 41 CENTREX 3000 6 Adults CENTREX 3000 NE 5 Adults Standard 41 Certified for liquid containment Weekend Vacation Use odors and solid end...

Страница 2: ...Models for which the manual applies CCEB 02510 Centrex 3000 115V CCNB 02540 Centrex 3000 NE CCEB 02515 Centrex 3000 230V...

Страница 3: ...3 3 4 5 6 6 6 6 7 7 7 8 8 8 9 9 9 10 11 12 13 13 Compost Troubleshooting Compost Too Wet Waste Not Breaking Down Lumps In Drum Drum Too Full Strong Odor Flies Present Mechanical Troubleshooting Urine...

Страница 4: ...he handle in a clock wise direction Compost will drop automatically into the collection chamber with SUN MAR s unique Autoflow technology Compost can be removed from the drum by pulling out the white...

Страница 5: ...heat is required if the composting toilet will be used continually or frequently If used for intermittent cottage application 3 4 weekends throughout the cold season no additional heat is required The...

Страница 6: ...r This is how you will remove compost during regular operation see page 12 4 After the toilet has been plugged in for ten minutes remove the compost finishing drawer at the bottom front of the toilet...

Страница 7: ...of the roof to prevent downdraft 7 How will I secure the stack if I need go to 24 30 inches above the peak of the roof Guy wires These should be available at your local hardware store you may have al...

Страница 8: ...CENTREX 3000 ROUGH IN DIMENSIONS 5...

Страница 9: ...ating element circuit which is intended to protect the fuse and is located on the electric box CENTREX 3000 NE Non Electric Space Required and other Installation Considerations 1 Ensure that the unit...

Страница 10: ...oing so will prevent the toilet from operating odorlessly All connections in the vent pipe should be sealed Use silicone caulking to seal the connection between the vent and the composting toilet A se...

Страница 11: ...e toilet from operating odorlessly All connections in the vent pipe should be sealed Use silicone caulking to seal connections closest to the toilet and PVC glue to seal any others The vent stack shou...

Страница 12: ...cessitate clamping the drain to the floor in some installations Fig 4 Effluent Handling The following are possible options to take care of the liquid Feed into a lined pit filled with gravel and sand...

Страница 13: ...toilets only The fan should run continuously 24 hours per day when installed in a primary residence 120 Volt Use Plug in to a three pronged electrical outlet 240 Volt Use The toilet must use a main p...

Страница 14: ...scoop tablespoon of Microbe Mix to the Bio drum to recharge the pile This will help to ensure your microbe colony stays constant and healthy Every three months Rake the evaporation chamber Remove the...

Страница 15: ...depression in the drum When the button is pulled the bar is pulled out of the depression which allows the drum to turn counter clockwise Turn the handle counter clockwise While holding the drum lock...

Страница 16: ...nces to the toilet Occasional Winter Use If the toilet will be used for 3 4 weekends throughout the winter season it is considered occasional use All of the same considerations should be taken with th...

Страница 17: ...only half full or less Rotate compost thoroughly to aerate and add compost accelerant Compost Quick and Microbe Mix Do NOT let drum get above 1 2 full This will lead to lack of aeration and the possib...

Страница 18: ...ent so it goes above the highest peak of the roof Occasional Urine Odor Outside CENTREX 3000 NE 1 Vent stack not installed above peak of roof 2 If vent stack is installed above roof line natural obstr...

Страница 19: ...is the build up area If drains are still clogged proceed to step 3 3 Use a wire to poke blockage out of the drain assembly A brown spot may be visible through the opaque assembly Drain all liquid thro...

Страница 20: ...te the drum until the drum screen is visible through the opening where the blank fan plate was located Spray the drum screen with Compost Quick let sit for 30 45 minutes then thoroughly scour with lon...

Страница 21: ...11 Power Cord 12 Insulation Electric 13 Heating Element and Aluminum Sheet 14 Centrex 3000 Heating Tray 15 Centrex 3000 Tank 16 Collection Bin Bottom 17 Drum Locker Assembly 18 Drum Bearing Strip 19 C...

Страница 22: ...Blue s mix enriches compost with organic carbon and also provides drainage of excess liquid ensuring compost remains aerobic and odor free 30 Litre 8 Gallon Bag DC Vent Kit Kit required for conversion...

Страница 23: ...Fax 905 332 1315 Customer Service 1 888 341 0782 Ext 218 E mail compost sun mar com www sun mar com 600 Main St 5370 South Service Rd Tonawanda N Y Burlington ON 14150 0888 L7L 5L1 U S A CANADA PO MAN...

Страница 24: ...Rd Burlington Ontario L7L 5L1 Canada WARRANTY SUN MAR Corp warrants the original purchaser that this toilet is free from defects in material and workmanship under normal house or cottage use SUN MAR C...

Отзывы: