5
Dealer PDI check list
Transport tyre pressures, 40 PSI
Wheel nuts, (270N/m 8 stud) (450n/m 10 stud)
Set markers
Set fan speed (start with low fan speed and raise slowly)
Check for Oil leaks with warm oil
Set up to match tractor, DB height and DB length
Fit electric power lead direct to tractor battery
Set working depth according to seed type and ground conditions
Ensure tractor is correctly balanced
Check forward speed reading is correctly calibrated
Train customer to use machine
o
Safe coupling and uncoupling to tractor
o
Free flow return in particular
o
Set coulter pressure
o
Setup machine to suit different crops
o
Coulter settings
o
Calibrate drill
o
Change seed rate
Содержание DTS Series
Страница 2: ...2...
Страница 6: ...6...
Страница 71: ...71 Warning fan return pressure 90 x 140mm 1 SWB321...