Sumner GH5T Скачать руководство пользователя страница 6

6

2.  Assemble Components 

1.  Lay out cross beam in a cleared area.  Position 

one A-Frame at either end of the cross beam as 
shown. 

2.  Lift one side of cross beam onto A-frame saddle 

and line up outside bolt hole on A-frame with the 
outer most bolt hole on cross beam. Place bolt 
through bolt hole on A-frame and cross beam 
with washers on either side of the bolt. Loosely 
tighten so A-frame/Cross Beam joint can swivel 
when A-frame is erected. 

3.  Place trolley onto the opposite end of the cross 

beam.  Center trolley on cross beam and tighten 
with set screws. 

4.  Lift opposite cross beam end and position onto 

second A-frame saddle lining up outside bolt 
hole on A-frame with outer most bolt hole on 
cross beam. 

5.  Place bolt through bolt hole on A-frame and cross 

beam with washers on either side of the bolt. 
Loosely tighten so A-frame/Cross Beam joint can 
swivel when A-frame is erected. 

6.  The supplied Chain Set and Hoist will be required 

to erect the A-Frames. 

7.  Attach the end most hooks on the Chain Sets to 

the eyelets on each A-Frame.   

8.  Attach the Hoist to the Spreader Plates on each 

Chain Set. 

Содержание GH5T

Страница 1: ...ss Park Pershore Worcestershire WR10 2TA UK phone 44 01386 556278 fax 44 01386 556776 NETHERLANDS Midden Engweg 21 NL 3882TS Putten Netherlands europeansales sumner com phone 31 0 85 489 0284 CANADA 7...

Страница 2: ......

Страница 3: ...11 12 Lift Diagram 12 Maintenance Instructions 13 14 Troubleshooting 14 15 Maintenance Record 16 OWNER S RESPONSIBILITIES Throughout this publication the words WARNING CAUTION and IMPORTANT will be u...

Страница 4: ...ver attempt to operate the equipment at more than the recommended capacity 7 No riders on unit This unit was designed for ma terial lifting purposes ONLY and is not designed to function as a personnel...

Страница 5: ...leg until the button clicks in place locking the leg in the open position 3 Roll Over the A Frame so that the Support Leg in facing up Pull spring loaded plunger ring and ex tend Support Leg until th...

Страница 6: ...trolley onto the opposite end of the cross beam Center trolley on cross beam and tighten with set screws 4 Lift opposite cross beam end and position onto second A frame saddle lining up outside bolt h...

Страница 7: ...le lock both casters by setting the rolling brake 12 Using a ladder place two bolts through the A Frame and Cross Beam using washers on both sides Tighten all three bolts to that the connec tion is se...

Страница 8: ...slotted keyway in the A Frame 7 Turn the winch handle counter clockwise 1 4 to 1 2 turn to place the weight of the GH5T on the Height Locating Pin CAUTION Be certain to check that lift is level after...

Страница 9: ...9 GH5T GANTRY SPECIFICATIONS...

Страница 10: ..._____________ Action Date __________________________________________________________________________ Action Date __________________________________________________________________________ Action Date...

Отзывы: