Page 6
A Greenhouse Side
5
3
3
5
Profile
Code
Qty
A2
A3
A1-6
A2-6
1
1
4
4
A3
2
G1
A1
G1
2
2
1
1
M610
Used for all sections so
quantity not listed in this
or other parts lists.
Step
3
Introduction
Before bolting the
Lay parts on the ground, as pictured at the
A2
glazing uprights to
top of this page.
the outside of the
Assemble loosely with the nuts to the
top gutter bar, insert
inside of the structure.
bolts into the
channels for fixing
A3
the diagonal braces.
Step
1
Step
4
A3
Insert bolt into the
Use the inserted
channel in the
bolts (see 3) to
upright (A3).
secure the diagonal
Bolt glazing uprights
braces to the
to the outside of the
G1
uprights. Do not
bottom bar.
tighten yet.
A1
A3
Step
2
Step
5
G1
Bolt diagonal braces
Bolt the diagonal
to inside of bottom
brace to the inside of
bar.
the top gutter bar.
Repeat for the other
A1
Note: the flat side of
A2
side of the
the bottom bar faces
Greenhouse.
inwards.
G1
Pictures viewed from inside the Greenhouse except where stated
For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828