Commissioning
Use the device - general instructions
• The device must be stable and easy to access.
• The connecting gear unit or the hydraulic system must be stopped when you start the
device.
• Always turn off the device before you do a check on the oil level in the gear unit or the
hydraulic system.
• Do a check on the oil level in the gear unit or the hydraulic system before the test run
of the device.
• Do a check for leakages and do a check on the oil level before you start the gear unit
or the hydraulic system again.
Commissioning
Procedure
1. Start the device. Refer to section
on page 25.
• Make sure that the oil flows through the device and into the gear unit or the
hydraulic system.
Caution: If the oil does not flow through the device and into the
gear unit or the hydraulic system within one minute, stop the device
immediately. Speak to S.D.T.
• Let the device run for some minutes.
2. Stop the device. Refer to section
on page 25.
3. Do a check on the oil level in the gear unit or the hydraulic system.
The commissioning is completed.
7
7.1
7.2
Commissioning
24
UM_VP2500L_002_EN
Содержание VP2500L
Страница 1: ...User Manual VP2500L Hansen Industrial Transmissions nv UM_VP2500L ...
Страница 34: ...Services 34 UM_VP2500L_002_EN ...
Страница 35: ...Services UM_VP2500L_002_EN 35 ...