
SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
4. PLANNING AND INSTALLATION INSTRUCTIONS
Attentions:
The shower has to be installed, rinsed and checked in compliance with the applicable regulations in order
to guarantee proper shower function!
The dimensions of the shower set-up must be individually.
Operating pressure at the control valve:
Max. 1Mpa. Recommended operating pressure: 3 bar pressure.
Hot water temperature: Max 60 degree centigrade (140 Fahrenheit).
5. CONCEALED BOX ASSEMBLY INSTALLATION
5.1
Make a mounting rack (normally use woods as materials) for preparing install the concealed box assembly .the mounting board’s
face should be Min 55mm [2-5/32"] and Max 70mm [2-3/4"] behind the finish wall surface.