
www.sumerain.com
5.2
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the valve body, allow the water flush
3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
HOT WATER SUPPLY
COLD WATER SUPPLY
5.3
Connect valve body to water supplies using the proper fittings for your valve body type (copper tubing, iron pipe or Pex).
Note:
For Pex, be sure to use the right fitting for crimping and the right tool for cold expansion.
We take copper tubing as example:
5.3.1(a)
Remove the cartridge and check-in valve and reducing valve from valve body before soldering.