SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
4.4
Turn on your shut-off valve for cleaning the hot and cold water supply tube before connect to the valve trim, allow the water flush
3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
4.5
Apply Teflon tape on the thread of tube inlet and then connect to rough-in valve.
Inlet Connector: NPT 1/2” (US/CA) and BSPP1/2”(UK,EU and other)
HOT
COLD