
5. INSTALLATION
5.1
Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water
flush 3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
5.2
Position spout onto the hole of mounting surface, attach rubber washer on spout shank and fasten with spout shank
locknut by wrench from underneath.