Lifting, transport and storage

8�1 Lifting

ATTENTION!  Observe the total weight of the Sulzer units and their attached components! 

 

 

 

(see nameplate for weight of base unit). 

The duplicate nameplate provided must always be located and visible close to where the pump is installed (e.g. 

at the terminal boxes / control panel where the pump cables are connected).

NOTE!  Lifting equipment must be used if the total unit weight and attached accessories exceeds local 

 

manual lifting safety regulations. 

The total weight of the unit and accessories must be observed when specifying the safe working load of any 

lifting equipment! The lifting equipment, e.g. crane and chains, must have adequate lifting capacity. The hoist 

must be adequately dimensioned for the total weight of the Sulzer units (including lifting chains or steel ropes, 

and all accessories which may be attached). The end user assumes sole responsibility that lifting equipment is 

certified, in good condition, and inspected regularly by a competent person at intervals in accordance with local 

regulations. Worn or damaged lifting equipment must not be used and must be properly disposed of. Lifting 

equipment must also comply with the local safety rules and regulations.

NOTE!  The guidelines for the safe use of chains, ropes and shackles supplied by Sulzer are outlined in  

 

the Lifting Equipment manual provided with the items and must be fully adhered to.

8�2   Transport

During transport, care should be taken that the pump is not dropped or thrown.

The unit is fitted with a lifting device to which a chain and shackle may be attached for transport purposes.

The unit should never be raised or lowered by the power cable.

Take note of the weight of the entire unit. The hoist and chain must be adequately dimensioned for 

that weight and must comply with the current valid safety regulations.

All relevant safety regulations as well as general good technical practice must be complied with.

8�3 Storage

1.  During long periods of storage the pump should be protected from moisture and extremes of cold or heat.
2.  To prevent the mechanical seals from sticking it is recommended that occasionally the impeller is rotated by 

hand. 

3.  If the pump is being taken out of service the oil should be changed before storage.
4.  After storage the pump should be inspected for damage, the oil level should be checked, and the impeller 

checked to ensure it rotates freely.

8�3�1  Moisture protection of motor connection cable

The motor connection cables are protected against the ingress of moisture along the cable by having the ends 

sealed at the factory with protective covers.

ATTENTION! 

The ends of the cables should never be immersed in water as the protective covers 

only provide protection against water spray or similar (IP44) and are not a water tight 

seal. The covers should only be removed immediately prior to connecting the pumps 

electrically. 

During storage or installation, prior to the laying and connection of the power cable, particular attention should 

be given to the prevention of water damage in locations which could flood.

ATTENTION! 

If there is a possibility of water ingress then the cable should be secured so that the 

end is above the maximum possible flood level. Take care not to damage the cable or 

its insulation when doing this.

Содержание ABS Piranha PE100/2-E-60

Страница 1: ...www sulzer com Submersible Grinder Pump Type ABS Piranha S10 PE125 6006085 08 12 2020 en Installation Operating and Maintenance Instructions...

Страница 2: ...features 6 5 1 Design features Piranha S 6 5 2 Design features Piranha S HH 7 5 3 Design features Piranha PE 8 6 Types of operation and frequency of starting 9 7 Weights 9 7 1 Piranha 9 7 2 Chain EN...

Страница 3: ...could result in pollution of the medium being pumped 1 1 Explosion proof approval Explosion proof motors of the Piranha series have certification in accordance with Factory Mutual FM Class 1 Div 1 Gr...

Страница 4: ...tem connected 2 Float switches and seal monitoring DI must be connected via an intrinsically safe electrical circuit Protection Type EX i in accordance with IEC 60079 11 3 Dismantling and repair of su...

Страница 5: ...d nameplate or where instead a standard and a secondary Ex nameplate is fitted to the pump the secondary nameplate must be removed Standard nameplate xx xxx xxxxxxx 1 min Max Liq Temp 40 C Qmax m3 h H...

Страница 6: ...9 18 4 2 1233 00 Shredding system 1 Cast iron lifting handle and steel shackle 2 Upper bearing single row 3 Motor with thermal sensors 4 Motor housing 5 Motor chamber pressure test point 6 Stainless s...

Страница 7: ...ign features Piranha S HH 8 9 1 2 3 4 5 7 6 1574 00 1 Oil chamber 4 Impellers 7 Cutting ring 2 Oil chamber drain plug pressure test point 5 Bottom plate 8 Volute 6 Shredding rotor 9 Diffuser 3 Mechani...

Страница 8: ...nal block 4 Moisture sensor DI 5 Oil chamber 6 Oil chamber drain plug pressure test point 7 Stainless steel lifting hoop 8 Upper bearing single row 9 Motor with thermal sensors 10 Stainless steel shaf...

Страница 9: ...29 0 13 0 29 35 77 S26HH 4 9 4 9 0 13 0 29 37 82 S30 4 9 4 9 0 13 0 29 0 13 0 29 0 13 0 29 51 112 PE 25 2W 4 9 4 9 0 18 0 4 0 18 0 4 77 170 PE 28 2D 4 9 4 9 0 14 0 3 0 14 0 3 0 14 0 3 0 14 0 3 77 170...

Страница 10: ...hich a chain and shackle may be attached for transport purposes The unit should never be raised or lowered by the power cable Take note of the weight of the entire unit The hoist and chain must be ade...

Страница 11: ...e sump 10 Pedestal 11 Guide tube 12 Discharge line 13 Non return valve 14 Gate valve 15 Power cable to motor The fitting of a guide tube is compulsory when the pump is installed on a pedestal ATTENTIO...

Страница 12: ...sed outdoors must be fitted with a power cable of at least 10 m length Other regulations may apply in different countries In all installations the power supply to the pump must be via a residual curre...

Страница 13: ...ion monitors only the motor chamber ATTENTION If the DI seal monitoring is activated the unit must be immediately taken out of service Please contact your Sulzer Service Centre NOTE Running the Piranh...

Страница 14: ...first time and also when used on a new site the direction of rotation must be carefully checked by a qualified person When checking the direction of rotation the unit should be secured in such a manne...

Страница 15: ...ce where fitted correctly installed Is the motor overload switch correctly set Have the power and control circuit cables been correctly fitted Was the sump cleaned out Have the inflow and outflows of...

Страница 16: ...x nameplate is fitted to the pump the secondary nameplate must be removed 12 2 Shredding system The shredding system of the Piranha is a wearing part and as such may need to be replaced A reduction in...

Страница 17: ...at the following intervals in commercial premises every three months in apartment blocks every six months in a single family home once a year In addition we recommend that a maintenance contract be t...

Страница 18: ...Temperature sensor shutdown Motor will restart automatically when pump cools down Check thermal relay settings in control panel Check for impeller blockage If none of above a service inspection is re...

Страница 19: ...19 SERVICE LOG Date Hours of Operation Comments Sign...

Страница 20: ...Sulzer Pump Solutions Ireland Ltd Clonard Road Wexford Ireland Tel 353 53 91 63 200 www sulzer com...

Отзывы: