background image

Knowing Your UPS

Brainy Eco Solar Home UPS is a solar hybrid system with Intelligent
Charging Sharing Feature. The battery charges through both Solar and
Grid by sharing the Charging Current.

In Charging Mode, Brainy Eco continuously monitors the state of Battery
Voltage, Solar Power Output and the Load. When the Battery Voltage
falls below a preset level, Brainy Eco transfers the load automatically
to the Grid/DG Power and also Charges the Batteries through the Grid
Charger. When the Batteries are charged to the preset level, the Grid/
DG Power Supply automatically disconnects from the system and the
load runs through Brainy Eco.

Features:
Over Current Protection

Charging Current from the Solar PV array is continuously monitored.
If the Charging Current exceeds 32 Amperes, then Charge Controller
stops further Charging. The Charge Controller restores the Charging
Process after 3.5 minutes automatically.

Solar Priority

Reverse Current Flow Protection

Brainy Eco is designed to give priority to the Solar Power and uses Grid/
DG Power only when the Solar Power/Battery Charge is Insufficient to
meet the load requirements.

Solar Charge Controller blocks any flow of Current from the battery to
Solar PV array during the night.

PV Panel Reverse Connection Protection

Powerful Built-In 30 Ampere Solar Charge Controller

The function of the In-built Solar Charge Controller is to charge the
Battery Bank till it is charged to its full capacity and prevent the battery
from getting overcharged.

Su-Kam’s 30 Ampere Built-In Charge Controller charges the battery and
runs the load at the same time. It is equipped with DT-6S 6 Stage Battery
Charging Technology .It recharges the battery faster and more efficiently
than the regular Chargers. Faster Recharging increase the performance
of the system by storing more output from the Photovoltaic Panel array.
The Charge Controller allows the maximum current generated in the PV
Panel to flow through the battery bank. It further regulates the charging
current to protect the battery bank from getting overcharged.

When PV Positive and negative wires are reversed at PV terminals then
only LED glows at the back panel.

Solar Photovoltaic Array

Panel Range- (80W-500W)

Intelligent Battery Charging Sharing

The maximum Battery Charging is done through Solar to reduce the
Power used from the Grid, thus saving Money on Electricity Bills.

If Solar can provide 10 Ampere Charging Current, then Grid Charging
Current will limit automatically at 5 Ampere. (Max. Battery Charging
Current Value is 15 Amp-Solar/Solar+ Grid/Grid)

7

Содержание Brainy Eco Solar Home UPS 1100

Страница 1: ...Installation Operation Manual Model No 1100 Patent Protected Copyright 2013 15 Su Kam Power Systems Ltd All rights reserved Design Registration No 253380 ...

Страница 2: ......

Страница 3: ...TES 16 LETTER TO CUSTOMER 08 2 IMPORTANT SAFETY INSTRUCTIONS E WASTE INFO 17 SALIENT FEATURES 09 3 TROUBLE SHOOTING 18 DO S DON TS 10 6 TECHNICAL SPECIFICATIONS BRAINY ECO 19 KNOWING YOUR UPS 11 7 15 TERMS CONDITIONS WARRANTY CARD 20 INSTALLATION ...

Страница 4: ...ome an Indian MNC and a successful example of Make in India as it has offices worldwide and over 40 000 channel partners across the globe The first Indian power solutions company to win the title of Superbrand Su Kam is counted among one of the fastest growing companies according to India Inc GLOBAL CERTIFICATIONS ISO 9001 2008 ISO 14001 2004 R D Recognized By MINISTRY OF SCIENCE TECHNOLOGY GOVERN...

Страница 5: ...o Solar Home UPS is Imagination Innovation and Intelligence The revolutionary product is our commitment towards bringing state of the art power back up solutions for your home establishment office needs Founded on the principles of 4th Generation Micro Processor DT 6S 6 Stage Battery Charger Brainy Eco has without doubt the most impeccable reputation of being an intelligent product that offers you...

Страница 6: ... In 30 Amp Solar Charge Controller User Settable Load Running Priority High Efficiency Intelligent Battery Charging Sharing 12A 3A 15A 30 AMP AMP 30 12A 3A 15A SOLAR CHARGE CONTROLLER 150Ah 150Ah DT 6S 6 Stage Battery Charging Technology Automatic By Pass Low Voltage Disconnect Noiseless Operation 3 ...

Страница 7: ...ty The user can select Grid Priority switch in High Power Cut conditions and Solar priority switch in Low Power cut conditions High Efficiency Intelligent Charging Sharing It charges the Battery First from Solar and then from Grid Only if required If battery needs 15A and Solar is giving 12A then it will take only 3A from Grid Battery Charging is done through Solar It has 98 battery charging effic...

Страница 8: ...ingly adjusts the charging of batteries Low Voltage Disconnect The customer can now easily switch between 10 5V and 11V If the customer wants more battery life then he she can keep the low voltage cut at 11V 4th Generation Micro Processor The 4th generation microp rocessor is the most advanced and latest technology in power solutions It is small in size efficient has high speed processor and has t...

Страница 9: ...iwala scrap dealer rag picker Call our local authorized dealer or toll free number to dispose your Brainy Eco Do not dismantle your Brainy Eco on your own Contact an authorized dealer in case of installation or de installation Do not get your Brainy Eco or any parts repaired by an unauthorized person Do not dispose off the E Waste in landfills Consult our local authorized dealer or our toll free n...

Страница 10: ... from the battery to Solar PV array during the night PV Panel Reverse Connection Protection Powerful Built In 30 Ampere Solar Charge Controller The function of the In built Solar Charge Controller is to charge the Battery Bank till it is charged to its full capacity and prevent the battery from getting overcharged Su Kam s 30 Ampere Built In Charge Controller charges the battery and runs the load ...

Страница 11: ...ny Eco 1 2 3 4 5 Solar ON Green Solar Charging Backup White Charge Yellow 6 SOLAR ON Solar ON Yellow 1 MAINS ON MCB TRIP This LED glows when mains available 2 BACKUP This LED glows when the system is on backup mode 3 CHARGE This graphical symbol will glow when the system is on charging mode There are TWO colour LEDs GREEN and YELLOW 4 OVERLOAD SHORT CIRCUIT This graphical symbol when glows indicat...

Страница 12: ...cted Solar charging with Normal blinking Yellow color LED System is ON Solar Available After Trip Grid Low mode Low Battery Mains ON Slow Blinking Backup White Solar ON Green Buzzer Beep Continuous ON System is ON Every 2 Sec Battery Low Red Continuous ON Solar ON Green Buzzer Beep System is ON After Trip Grid Low mode Solar Mains ON Backup White Charge Yellow Solar ON Yellow Buzzer Beep Slow Blin...

Страница 13: ...olar Available System is ON Solar Available Yellow color LED fast blinking PV Voltage High Overload Short Circuit Backup White Overload Red Solar ON Green Buzzer Beep Continuous ON Continuous ON System is ON After Trip In all Solar Modes as mentioned before Solar ON Yellow System is ON Solar Available Yellow color LED slow blinking PV Voltage Low Overload Short Circuit Solar Backup White Charge Ye...

Страница 14: ...0W 350W 400W 500W SWITCH S1 S2 S3 S3 GRID CHARGING ENBLE DISABLE SWITCH 6 G CD G CD 6 6 5 5 GCE GCD G CE G CE BACKUP SWITCH 5 Low Backup 1 0 5 V LV D High Backup 1 0 5 V LV D 1 1 V LV D 1 1 V LV D CAUTION For 300W Solar Panel connect 1 battery of 150Ah However for 400W 500W Solar Panel connect 2 batteries of 150Ah 12V each in parallel connection GRID SOLAR PRIORITY SWITCH 3 4 GRID CHARGING GRID PR...

Страница 15: ...r and Charging the Battery by Solar Grid Charging Disable Enable ON OFF ON OFF Disable 9 9 3A 0A Grid Supply 12A 15A 12A 3A Grid Supply 12A 12A 250W 12V 150AH 12V 250W 12V 150AH 12V Battery Charging Through Solar Grid Power Battery Charging Through Solar Power only Grid Power Solar Power Solar Grid Power Load Running On Grid only Load Running On Grid only 12 ...

Страница 16: ...r Panel provides 15Amp Current than BRAINY ECO doesn t take any Current from Grid to Charge the Battery Grid Power Solar Power Solar Grid Power 150Ah Battery requires 15Amp Charging Current If Solar Panel provides 10Amp Current than BRAINY ECO takes 5Amp Current from Grid to Charge the Battery The charging sharing takes place only when the current from the solar is below 15Amp 13 ...

Страница 17: ... Panel Range 80W to 500W Charges Battery and Runs Load Simultaneously Powerfull Enough to Run 7 Computers 7PC 300AH 12V Recommended 14 Inch TFT Monitor with Model 1100 Tested under ideal conditions for 7 computers 14 ...

Страница 18: ...he battery Step 2 Connect the Panel Step 3 Connect to Input Mains Step 4 Connect to Output Fan CFL TV Please make sure that the system is switched off during installation MCB Mains input Grounding MCB Electric Meter 2 2 4 1 1 3 15 ...

Страница 19: ...E VICINITY OF A LEAD ACID BATTERY MAYBE DANGEROUS BATTERIES GENERATE EXPLOSIVE GASES DURING NORMAL OPERATION Provide ventilation to outdoors from the battery compartment The battery enclosure should be designed to prevent accumulation concentration of hydrogen gas in pockets at the top of the compartment Vent the battery compartment from the highest point A sloped lid can also be used to direct th...

Страница 20: ...our computer Avoid connecting the stabilizer between utility power Solar Home UPS The AVR of stabilizer may cause your computer to reboot We recommend that you have point to point wiring for the Solar Home UPS Grounding Instructions Brainy Eco must be connected to a grounded permanent wiring system As per Government of India s E Waste Management and Handling Rules 2011 effective from May 1st 2012 ...

Страница 21: ... faults For point 1 The customer should allow the battery to charge before using the backup For points 2 5 Call our service center 1800 102 4423 No output power Grid or DG Power is available and display is showing low battery but unit is operat ing in backup mode Solar Home UPS does not operate Grid Power is coming UPS shows Grid MCB trip on its LED panel Grid DG supply is out of range and PV is i...

Страница 22: ...d PV power will be 2V 1V watt after that transfer to backup mode Mains to W UPS 40 milliseconds Mains to UPS 15 milliseconds In built Solar Charging Maximum Input PV Voltage Charging Current Imax Protection Automatic Charger Restart Solar Charge In Built Controller to PV power connection time Display Type 25V Max for 12V System 30 2A Max Over Current Battery over Charge PV Reverse Polarity Reverse...

Страница 23: ...cident abuse misuse neglect improper installation if not undertaken by the company or its representative fire flood other acts of GOD natural calamities and any other unauthorized repairs done or carried out will have to be borne by the purchaser The problem of fuse blown will not be included in the warranty of the product The services given for the same will be paid service The company will not b...

Страница 24: ...OLOGIES Office Plot No 64 HMT Hills Colony Nearby Tulasi Nagar Community Hall Kukatpally Hyderabad 72 Telangana India Tel 91 9010777780 9603777780 E mail mstsaleshyd gmail comWebsite www mstechnologiesups com ...

Отзывы: